My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-342
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 10:46:29 AM
Creation date
9/30/2015 10:12:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2006
Control Number
2006-342
Agenda Item Number
7.U.U.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South County Reverse Osmosis Water Treatment Plant-Work Order No. 14
Supplemental fields
SmeadsoftID
5884
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment #1 <br /> Work Order # 14 <br /> South RO Water Treatment Plant <br /> Upgrades and Modifications to Restore Capacity <br /> PROJECT DESCRIPTION AND HISTORY <br /> The existing Oslo Road South Reverse Osmosis (RO) water treatment plant is more than 20 years <br /> old and with this age, improvements and replacement of some key components are necessary to <br /> maintain treatment capacity of the plant and bring the facility up to current standards . Currently, <br /> the facility' s rated capacity is listed as 8 .57 million gallons per day (mgd), however, membrane <br /> system performance, high service pumping capacity, and wellfield pumping capacity are limiting <br /> the facility' s ability to meet this capacity. This 8 .57 mgd rated capacity consists of 6 .0 mgd in RO <br /> production and 2.57 mgd of raw water blended with the RO produced water. The RO treatment <br /> system operates at 80% recovery which means the 6 .0 mgd of RO production requires 7.5 mgd of <br /> raw water. When combined with the 2. 57 mgd of blend water, the total raw water requirement is <br /> 10.07 mgd. Additionally, some of the components may not be utilized to their full useful <br /> operating capacity which limits the overall treatment plant capacity. The following Scope of <br /> Services describes the major improvements which will not only restore the facility to its rated <br /> capacity, but allow for operation at a greater capacity than what the facility is currently rated for. <br /> An evaluation of the existing South RO Plant operations and treatment capacity was conducted by <br /> Kimley-Horn and Associates, Inc. in August 2005 (see attached Table 1 ) which outlined several <br /> areas for improvement. These major areas for improvements are summarized in the following <br /> table. <br /> Com op nent Current Ca aci Required Ca aci Deficiency <br /> Supply Wells 8 .93 mgd (largest O/S) 10.03 mgd (largest O/S) 1 . 1 mgd <br /> Membrane System 5 .4 mgd (elevate pressure) 6 .0 mgd (reduce pressure) 0 .6 mgd <br /> High Service Pumps 6 .9 mgd (largest O/S) 8 .57 mgd (largest O/S) 1 . 67 mgd <br /> This Scope of Services will address the Membrane System and High Service Pump deficiencies. <br /> Although the supply well deficiency is believed to be addressed by others through modification of <br /> the existing Consumptive Use Permit, pumping capacity from the wellfield may still be <br /> insufficient to support the treatment capacity of 8 . 57 mgd MDF . All three areas of improvements <br /> are listed as necessary improvements in the Master Plan Update, dated December 2004, prepared <br /> by PBS&J. <br /> PROJECT APPROACH <br /> The following Project Approach addresses modifications to the existing membrane treatment <br /> system, membrane replacement, upgrading membrane booster pump capacity, and replacing the <br /> existing high service pumps, motors, and starters with larger capacity pumps and new variable <br /> frequency drives (VFD). In general, the limiting component in overall plant capacity is the high <br /> service pump system which is unable to pump plant production capacity of 8 .57 mgd to the <br /> customers with the largest pump out of service (O/S) as required by FDEP regulations. The next <br /> component that limits capacity is the membrane treatment trains and their inability to provide the <br /> C:\MDM Files\South RO Plant Upgrades to RestoreCapacity-reAdoc Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.