My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-342
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 10:46:29 AM
Creation date
9/30/2015 10:12:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2006
Control Number
2006-342
Agenda Item Number
7.U.U.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South County Reverse Osmosis Water Treatment Plant-Work Order No. 14
Supplemental fields
SmeadsoftID
5884
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nor shall the Consultant have any authority or responsibility to stop or direct the work of any <br /> Contractor. <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the <br /> project. The Consultant will perform two site visits with the Contractor to review the status of the <br /> completion of these punch-list items . <br /> Prior to loading new membranes, on-site testing and debugging of the control logic will be <br /> conducted by the Contractor. On-site testing will also be conducted by the Contractor after the <br /> higher capacity membrane feedwater pumps and RO train modifications are completed. <br /> Consultant will observe on-site testing of the automated operation of one of the trains to verify <br /> proper operation following completion of construction by the contractor. After completion of <br /> testing on the first train to be performed by the Contractor, the revised operating values will be <br /> used to verify operation of the other three trains. Once new membranes are loaded, one train at a <br /> time, retesting of each train will be conducted by the Contractor and operating parameters tuned <br /> to optimize operation. These values will be utilized and applied to the remaining trains. Proper <br /> operation of each additional train will be confirmed by the Contractor. <br /> SCHEDULE <br /> An overall project schedule is provided as Exhibit 1 . It is anticipated that installation of new <br /> membranes can commence in late January 2007. <br /> FEES <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated April 6, 2004 with Indian River County. <br /> The Consultant will provide these services for a Lump Sum fee as follows : <br /> Task No. Task Task Fee <br /> Task 1 Prepare Documents/Scope of Work for S191100 <br /> Membrane System Upgrades <br /> Task 2 High Service Pumps Design $58 , 700 <br /> Task 3 Coordination and Procurement $ 9, 800 <br /> Task Permitting $ 15,600 <br /> Task 5 Services During Construction $65 ,300 <br /> Total Lump Sum Fee = $168,500 <br /> Additional Services : <br /> This Scope of Services does not include the following elements for this project that may be <br /> required depending on circumstances that may arise during the execution of this project . Some <br /> elements that may be considered additional services are mentioned herein. Additional services <br /> include, but may not be limited to the following: <br /> • Upgrade to the existing generator and auxiliary power system is not expected but can be <br /> provided as an additional service. With upgrades to the existing lift station 489 with a <br /> C:\MDM Files\South RO Plant Upgrades to Restore Capacity-rev9.doc Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.