My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-342
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 10:46:29 AM
Creation date
9/30/2015 10:12:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2006
Control Number
2006-342
Agenda Item Number
7.U.U.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South County Reverse Osmosis Water Treatment Plant-Work Order No. 14
Supplemental fields
SmeadsoftID
5884
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new generator, this load can be shed from the water plant generator, allowing adequate <br /> capacity for the addition high service pumps. <br /> • Bidding beyond what is described herein <br /> • Updating capacity analysis report is not included <br /> • Modifications to the concentrate disposal capacity and/or quality is not included under <br /> this scope but can be addressed under a separate work order. <br /> • Upsizing of wells or pumps is not included under this scope. <br /> C DM Files\South RO Plant Upgrades to Restore Capacity-rev9.doc Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.