ATTACHMENT 2 <br /> 90th Avenue Regional Pump Station <br /> Opinion of Construction Costs <br /> In-Line System <br /> December-06 <br /> OPINION OF PROBABLE CONSTRUCTION COSTS <br /> ITEM QUANTITY UNITCOST COST <br /> SITE WORK <br /> Mob/Demob 1 545,00000 545,000 <br /> Clean ubl raddsec&mulch I 58,000.00 58,000 <br /> Landscape buffer I 522,000.00 522,000 <br /> Fence 400 $25 ft 510,000 <br /> Drainage Imrovements 1 512,500 512,500 <br /> Stabilized access road 800 $ 15.00 s d 512,000 <br /> Sod 3000 $ 1 ,60 SO $4,800 <br /> 5114,300 <br /> BUILDING (650 sit ft) <br /> Builders Risk 1 S12,000.00 1 S12,000 <br /> Preparation 1 $8,500.00 1 58,500 <br /> Excavation 35 5250.00 c d $8,750 <br /> Slab, footings, mat rebar, concrete,..] 35 8600.00 c d 821 ,000 <br /> Walls (CMU) 165 5350.00 s R $57,750 <br /> Columns, beams 15.0 590000 cyd 513,500 <br /> Will insulanan 50 $30.00 cyd SI ,500 <br /> Roofslab 650 530.00 s ft $ 19,500 <br /> Roofing 650 $3000 s R $ 19500 <br /> Doors, louvers, windows 6 $7,500.00 545,000 <br /> AIC unit I S9,500.00 $9,500 <br /> Shrew 7150 $ 10.00 s B $ 111500 <br /> Painting 3500 $8.50 s 0 $29,750 <br /> $257,750 <br /> YARD PIPING, VALVES, ETC <br /> 2" FM to CR 510 11001 20 It $22,000 <br /> New packagelift Station I 45,000 545,000 <br /> 12" PVC C-900 2200 S72 D 5158,400 <br /> 12" Ml gate valves 4 53,000 512,000 <br /> 12" DIP 60 S70 B $4,200 <br /> 8" DIP 80 $65 B $5,200 <br /> 12" linins 7600 $3.20 lbs $24,320 <br /> 8" fittings 525 S320 lbs 51 ,680 <br /> 8" plug valve 6 $2, 100 512,600 <br /> 8" check valve 3 $ 1 ,900 55,700 <br /> S291,100 <br /> FUEL TANK <br /> Convault I 542,000 542,000 <br /> Fuel piping (supplyand return) 60 $ 120 It 57,200 <br /> Fuel level monilar 1 $8,500 S8,500 <br /> $57,700 <br /> PUMPS <br /> 20 hp FI is 3 517,000 S5I ,000 <br /> Air release valves 2 52,400 $4,800 <br /> Gages, sensing lines, hose bibbs 2 $2,300 54,600 <br /> Slab, pipe suppons 7 $900 c d 56,300 <br /> Misc metals 1 57,500 57,500 <br /> Painting I 54,500 54,500 <br /> $78,700 <br /> ELECTRICAL <br /> 125 kw Gcneraior 1 $65,000 S65,000 <br /> Main breaker 1 58,000 S8,000 <br /> MCC 1 $35,000 S35,000 <br /> 2011P VFD'S 3 513,500 540,500 <br /> Wiring for PUMES & control valves 40 5120 R $4,800 <br /> Disconnects 3 52,400 $7,200 <br /> Xfr switch I S13,500 513,500 <br /> FPL feeder 1 $4,500 S4,500 <br /> Control pariel I S25,000 525,000 <br /> Lighting, LP's, receptacles.... 1 $21 ,000 S21 ,000 <br /> 5224,500 <br /> INSTRUMENTATION <br /> PLC hardware I 529,000 $29,000 <br /> Flow meter (ma ) I 510,000 SI0,0o0 <br /> Pressure devices 9 SI ,200 510,800 <br /> RTU 1 $ 15,000 515,000 <br /> Transmitters 2 56,500 513,000 <br /> 577,800 <br /> CONTINGENCY (25%) S275,463 <br /> mu eau TOTAL $ 1,377,313 I p%mu.eR9u110r+ ST E T xlS <br />