PPP� = " Kimley-Horn <br /> ®i and Associates, Inc. <br /> A request for final release of the modifications will be submitted to FDEP , consisting of <br /> certification application, record drawings, etc . <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the <br /> project. Consultant will provide two site visits with the contractor to review the status of the <br /> completion of these punch-list items. <br /> SCHEDULE <br /> Tasks 1 and 2 are anticipated to be completed within 8 weeks from notice to proceed. Task 3 is <br /> anticipated to be completed within 8 - 10 weeks after Task 1 is completed, with Task 4 to take <br /> approximately 8 weeks after task 3 is completed. Task 5 will take approximately 6 weeks after <br /> Task 2 is complete. <br /> INFORMATION PROVIDED BY OWNER <br /> The Owner shall provide the record drawings of water and sewer utilities near CR 510 and 90"' <br /> Avenue and historical data and projections of the system. Consultant shall rely on the accuracy of <br /> this information. <br /> Owner shall furnish an updated wastewater system hydraulic model for this area. Consultant shall <br /> rely on the accuracy of this information. <br /> FEES <br /> Consultant will provide these Services as described herein for a lump sum amount of: <br /> Task Fee $ <br /> 1 . Survey $ 11 ,500 <br /> 2 . Hydraulic Design $ 6,200 <br /> 3 . Site Design, Final Facility Sizing $ 17,700 <br /> 4. Permitting (Site and FDEP) $ 10, 100 <br /> 5 . Upgrade Existing Pump Stations $ 11 ,900 <br /> 6. Construction Phase Services $ 32,300 <br /> Total $ 89,700 <br /> We will provide these services in accordance with our Continuing Services Contract Agreement for <br /> Professional Services dated April 6, 2004 with Indian River County. I <br /> CADocuments and SettingsMbrown\Local Settings\Temporary Internet Files\OLKI317\90th Ave In-line Wastewater Booster Station - rev <br /> 3 .doc Page 5 <br />