Laserfiche WebLink
Kimley-Horn <br /> �': = and Associates, Inc. <br /> Task 6 - Construction Phase Services <br /> Consultant will provide construction phase services for this project, consisting of bidding and <br /> contract administration, shop drawing review, coordination and meeting attendance, construction <br /> observation, start-up services, preparation of record drawings, consisting of electronic format, <br /> AutoCadd version 2004 in real world coordinates on CD, mylars, and final certification of <br /> completion of the project. It is anticipated that the duration of construction phase (notice to <br /> proceed to final completion) will be six (6) months and that on-site construction observations will <br /> be as appropriate with the level of construction activity. <br /> Consultant will provide coordination effort in revising front-end documents based on County <br /> assistant attorney comments. <br /> Consultant will answer bidder questions and prepare addendums, if needed which will be <br /> distributed to all the contract document holders . Consultant will attend a pre-bid meeting at the <br /> project site or main office. Consultant will sell project manuals from consultant' s office, including <br /> drawings, specifications, and generation of all addendums. <br /> Shop drawing submittals will be reviewed for conformance with the contract documents. Shop <br /> drawings will be submitted directly to consultant. Consultant will review the submittals and return <br /> copies to the contractor and Indian River County Utilities. <br /> Consultant will provide coordination of project status meetings and observation of construction for <br /> the duration of the project. Consultant will also review pay requests and provide recommendations <br /> for payment to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector. Total observation time will be <br /> approximately 120 hours. The field inspector will observe construction in order to determine if the <br /> project is being constructed in accordance with the contract documents . The Consultant's visits will <br /> be for the purpose of endeavoring to provide the Client a greater degree of confidence that the <br /> completed work of its contractors will generally conform to the construction documents prepared <br /> by the Consultant. Consultant neither guarantees the performance of contractors, nor assumes <br /> responsibility for any contractor's failure to perform its work in accordance with the contract <br /> documents. This will consist of witnessing installation of piping, pressure testing of new piping, <br /> installation of mechanical equipment, etc . Work that Consultant believes does not comply with the <br /> contract documents will be brought to the attention of Indian River County Utilities and the <br /> contractor. <br /> The Consultant shall have no responsibility for any contractor's means, methods, techniques, <br /> equipment choice and usage, sequence, schedule, safety programs, or safety practices, nor shall <br /> Consultant have any authority or responsibility to stop or direct the work of any contractor. <br /> Start-up of the new pumps will be facilitated by the pump manufacture ' s representative and by the <br /> Contractor. Consultant will observe start-up of the new pumps once the installation is completed. <br /> Consultant will prepare record drawings of the forcemain using information provided by the <br /> contractor. These record drawings will be used for final FDEP clearance of the facility, and <br /> incorporation into the Owner's GIS . A complete set of Mylar reproducible drawings, an electronic <br /> copy in AutoCAD format on a CD-ROM, and two sets of prints will be delivered to Indian River <br /> County Utilities upon completion of this project. <br /> C\Documents and Settings\lbrown\Local Settings\Temporary Internet Files\OLK13F\90th Ave In-line Wastewater Booster Station - rev <br /> 3-doc Page 4 <br />