= " Kimley-Horn <br /> ®' = C ___, and Associates, Inc. <br /> the County in electronic format (AutoCAD 2004 / MS Word or latest version, respectively) at the <br /> end of the project. The technical specifications and standard details will be based on the County' s <br /> current Utility Standards. <br /> The design plans recently completed for the 64" Avenue in-line booster station were developed to <br /> be utilized on similar booster stations, such as this . These design drawings will be adapted to this <br /> facility. Modifications to the specific pump sizes and electrical starters to these pumps will be <br /> modified to match the size as listed herein . Modifications will include inlet and discharge piping <br /> and valves, electrical starters, feeders, and disconnects . <br /> Approximately four (4) drawings depicting plan and profile of the on-site 1100 ft of influent and <br /> effluent piping will be designed . <br /> Task 4 —Permitting <br /> Since the site should not include pervious area more than 1000 sqft, it is assumed that only <br /> administrative approval from planning and zoning and BCC is necessary. This scope includes <br /> preparation of a submittal package to planning/zoning board for subsequent submittal to BCC for <br /> approval . Up to four (4) meetings will be attended for TRC preapplication, public notice meeting, <br /> zoning/board meeting, and BCC meeting. Meetings beyond that are considered additional services. <br /> A letter request to SJRWMD for exemption of stormwater permit will be prepared and submitted, <br /> including landscaping drawings and details, and submittal and coordination with the committee. <br /> Consultant will include the $250 application fee . <br /> Consultant will prepare and submit one FDEP general permit application 62-604.3000(8)(a) for the <br /> pump station . The permit application fee of $500 will be included under this scope and paid by <br /> Consultant. Consultant will submit the permit application when the drawings and specifications <br /> are complete. Consultant will respond to one request for additional information (RFI' s) from <br /> FDEP. <br /> An Indian River County ROW permit application will be submitted for the forcemain piping <br /> located within CR510 right-o£-way. <br /> Task 5 —Upgrade Existing Pump Stations <br /> The existing smaller lift stations downstream of the proposed master pump station at 90th Avenue <br /> and CR 510 may need to be upgraded as result of constructing an in-line pump station. Consultant <br /> will prepare a scope of work and upgrades required for up to 4 pump stations. The scope of work <br /> will consist of preparation of scope, minor modifications to drawings for the intended stations, and <br /> specifications for these modifications . Permit applications (FDEP) for these stations will be <br /> prepared along with the application for the master station . Permit application fees will be included <br /> and are assumed to be approximately $ 1250. <br /> Installation of a small grinder type station will be included at the Douglas School site. Preliminary <br /> sizing has been performed, but final drawings will consist of a 2" forcemain out to CR 510 which <br /> has not been completed. This task will consist of completion of the drawings for the grinder station <br /> near Douglas School - <br /> C\Documents and Settings\lbrcwn\Local Settings\Temporary Internet Files\OLK13F\90th Ave In-line Wastewater Booster Station - rev <br /> 3 .doc Page 3 <br />