Laserfiche WebLink
/ Kimley-Horn <br /> and Associates, Inc. <br /> SCOPE OF SERVICES <br /> The 64th Ave pump station has been designed as an in-line pump station. The design is completed <br /> and the "footprint" can be re-used for the 90'h Ave pump station. Additional work such as survey <br /> of the site, site design, site plan permitting, modifications to surrounding small pump stations, <br /> extension of approximately 1100 ft of on-site forcemain, and hydraulic modeling are additional <br /> items which need to be performed for the 90th Avenue site . Consultant will prepare project <br /> drawings and specifications for the project which can be advertised for bidding by general <br /> contractors . Consultant will prepare and submit the appropriate permits listed herein for the <br /> construction of the project. Consultant will provide construction phase services during <br /> construction, witnessing startup and operational testing, and provide final certification of the <br /> facility. <br /> The scope consists of the following: <br /> Task 1 — Survey <br /> Consultant will provide survey of one site for the facility located near the Southeast comer of CR <br /> 510 and 901h Avenue on the North County Elementary School site where the master pump station <br /> will be located . Additional survey will consist of on-site influent and effluent piping which is <br /> assumed to be approximately 1100 ft total length. The site survey will consist of a boundary <br /> survey for easement transfer with the property owner, which will also consist of at least a <br /> 100 'x100 ' area, topography, and other above ground information. It is anticipated that the site <br /> granted to Utilities will be approximately 50 'x50 ' , not including access to site. <br /> For the influent/effluent forcemain piping, survey of the intersection will be provided up to 100 ft <br /> in either direction, including, edge of pavement, existing utilities, and benchmark. Right of way <br /> information will be shown on the survey . It is assumed that Utilities will provide locates of their <br /> existing lines at the intersection. <br /> Task 2 — Hydraulic Design <br /> The design will consist of hydraulic evaluation to clearly define conditions of service through <br /> build-out conditions, pump station design, pipe sizing, preparation of drawings and specifications <br /> for a master pump station, plan and profile of approximately 1100 ft of influent and effluent pipe <br /> length to the pump station from CR 510, and electrical and controls design. <br /> Consultant will utilize the existing sewer system master plan hydraulic model prepared by PBS&J <br /> to establish future flows and hydraulics of the sewer system and determine present and future <br /> configuration and operation of the pump station for pump size selection, and the impacts to the <br /> existing stations between 90" Avenue and 64th Avenue. <br /> Task 3 — Site Design and Final Facility Sizing <br /> Construction drawings will be prepared which will consist of a site plan, building plans and <br /> elevations, plan/profile of the forcemains from and to connections near the intersection of CR 510 <br /> and 90" Avenue, details, electrical schematics and process instrumentation and panel drawings for <br /> the pump station . It is anticipated that approximately 20 to 22 drawings will be prepared. <br /> Consultant will provide copies of technical specifications, full size (24x36) and half size ( 11x17) <br /> drawings for bidding and construction. All plans and technical specifications will be provided to <br /> C:\Documents and Settings\Ibrc wn\Local Settings\Temporary Intemet Files\OLK13F\90th Ave In-line Wastewater Booster Station - rev <br /> Mae Page 2 <br />