My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-249
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:59 AM
Creation date
9/30/2015 8:59:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/19/2005
Control Number
2005-249
Agenda Item Number
11.I.1
Entity Name
Malcolm Pirnie, Inc.
Subject
Egret Marsh Regional Stormwater Park
Attachment 1 to Work Order No.1-EM
Area
Egret Marsh
Supplemental fields
SmeadsoftID
5090
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTA <br />RK ORDER NI <br />SUPPLEMENTAL VALUE ENGINEERING AND QUALITY ( <br />REVIEWS OF THE EGRET MARSH REGIONAL STORMWA <br />1. PROJECT UNDERSTANDING <br />The County is having final design documents prepared by Hydra <br />Environmental Consulting & Technology, Inc.; and G. K. Environmental, Inc <br />Marsh Regional Stormwater Park (Egret Marsh) in southwest Indian River <br />major components of the design includes at least two pumping stations, the <br />of two existing borrow pits for stormwater treatment processes (primary se <br />polishing), a proprietary algal turf scrubber system, and a small polishing wet <br />2. BACKGROUND <br />The County is interested in an independent analysis in the form of a value <br />constructibility review of the design contract documents. The scope of worl <br />value analysis and constructibility review activity that will be performed on t <br />50 percent and 90 percent complete contract documents (drawings <br />specifications). The value analysis activity will provide both potential consti <br />cycle cost savings by developing alternative approaches to constrl, <br />specifications, and material selection. The value analysis and constructibilit) <br />performed on the following specialty design disciplines: <br />Civil <br />Mechanical <br />Electrical <br />Instrumentation/Process Control <br />The value analysis and constructibility review will not be performed on the str <br />discipline. <br />The constructibility review will identify those areas in the documents, <br />potentially cause field problems and delays during the construction <br />constructibility review comments will potentially improve the quality of the co <br />on this project. <br />3. SCOPE OF WORK <br />TASK NO. 1 — Meeting with County and Design Team <br />Attend three meetings with the County and the Design Team. The pu <br />meetings will be to discuss review comments from the previous submittals. <br />12 hours for technical assistance outside the formal meeting format. <br />TASK NO. 2 — Letter Response for 20% Design Completion <br />Prepare and submit a letter report to provide comments concerning issues a <br />2 <br />CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\OLKA9\Malcolm Pirnie Work Order <br />NTROL <br />R PARK <br />)mentia, Inc.; <br />for the Egret <br />County. The <br />rehabilitation <br />cling and final <br />land system. <br />analysis and <br />will include a <br />ie 20 percent, <br />and technical <br />uction and life <br />Iction details, <br />review will be <br />ctural design <br />which could <br />hase. The <br />tractors' bids <br />)ose of these <br />Also includes <br />;sociated with <br />-EM.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.