My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-249
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:59 AM
Creation date
9/30/2015 8:59:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/19/2005
Control Number
2005-249
Agenda Item Number
11.I.1
Entity Name
Malcolm Pirnie, Inc.
Subject
Egret Marsh Regional Stormwater Park
Attachment 1 to Work Order No.1-EM
Area
Egret Marsh
Supplemental fields
SmeadsoftID
5090
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the value analysis and constructibility review of the 20 percent submittal <br />Activities <br />2.1 Review contract drawings to identify potential changes that <br />savings in both capital and life cycle costs through an eval <br />specified design discipline of the project. <br />2.2 Review technical specifications to identify potential changes that <br />savings in both capital and life cycle costs. <br />Prepare value analysis and constructibility review letter report identifying th <br />savings. <br />TASK NO. 3 — Letter Response for 50% Design Completion <br />Prepare and submit a letter report to provide comments concerning issues <br />the value analysis and constructibility review of the 50 percent submittal pa <br />Activities <br />3.1 Review contract drawings to identify potential changes that <br />savings in both capital and life cycle costs through an evalu <br />specified design discipline of the project. <br />3.2 Review technical specifications to identify potential changes that <br />savings in both capital and life cycle costs. <br />3.3 Review the Design Consultant's opinion of probable construction <br />3.4 Prepare value analysis and constructibility review letter report <br />potential cost savings. <br />TASK NO. 4 — Letter Response for 90% Design Completion <br />Prepare and submit a letter report to provide comments concerning issues <br />the value analysis and constructibility review of the 90 percent submittal <br />activities associated with this Task will be similar to those for Task No. 3, <br />4. DELIVERABLES <br />Five copies of the value analysis and constructibility review letter report <br />to the County for the 20 percent, 50 percent, and 90 percent submittal pac <br />**END OF ATTACHMENT 1 ** <br />e. <br />)uld provide <br />ion of each <br />could provide <br />potential cost <br />iated with <br />M <br />ould provide <br />tion of each <br />could provide <br />St. <br />dentifying the <br />ated with <br />ge. The <br />will be submitted <br />3 <br />CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\OLKA9\Malcolm Pirnie Work Order <br />es. <br />I-EM.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.