My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-061
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 2:00:02 PM
Creation date
9/30/2015 10:36:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2007
Control Number
2007-061
Agenda Item Number
11.I.2
Entity Name
Arcadis G&M Inc.
Subject
Work Order No.2 4-Lane Widening of 43rd. Ave.
Area
25th St. SW to Oslo Road (9th St. SW)
Supplemental fields
SmeadsoftID
6134
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . The design plans will be submitted to the COUNTY for review at the 30%, 60%, 90% and 100% <br /> stages of design. Permit application submittals will be made before or subsequent to the 90% <br /> plan set submittal approval by the COUNTY . <br /> E . Computation Book <br /> The 100% submittal shall include a computation book with quantity calculations for all pay items. <br /> F . Drainage Plans <br /> 1 . Drainage Parameters: ENGINEER will design a pipe and inlet drainage system for <br /> the project. ENGINEER will perform storm water drainage hydrologic and hydraulic <br /> calculations to determine the pipe sizing, water quality treatment, and storm water <br /> attenuation requirements within the project limits. <br /> Offsite storm water ponds may be required for the project. ENGINEER will analyze <br /> alternative measures for water quality treatment and attenuation. The alternative <br /> measures will be reviewed with Indian River County. Preparation of final plans for <br /> storm water ponds is included in this agreement. <br /> Perform drainage investigations and analysis necessary to prepare a design, which will drain the <br /> project in accordance with the COUNTY, IRFWCD and SJRWMD design criteria. <br /> 2. Environmental Permits : <br /> The ENGINEER shall prepare stormwater and wetland permit applications as required for the St. <br /> Johns River Water Management District, IRFWCD, FDEP, US Environmental Protection, Indian <br /> River County for Clearing and Tree Removal requirements for submittal by the COUNTY. This <br /> will consist of all required evaluation, design, coordination, and follow-up work necessary to <br /> support permit applications . The COUNTY will review the permit applications as necessary. <br /> The ENGINEER shall assemble and be responsible for the final submittal. <br /> The ENGINEER shall prepare permit sketches for submission by the COUNTY to Florida <br /> Department of Environmental Protection, U. S. Army Corps of Engineers, IRFWCD and St. <br /> Johns River Water Management District for Dredge and Fill activities, if necessary. The <br /> ENGINEER shall submit all permit sketches on 8 " x 11 " sheets . Sketches shall be neatly scaled, <br /> signed and sealed, and reproducible. <br /> Permit application packages will be prepared and submitted to the following <br /> agencies: <br /> • SJRWMD — drainage permit <br /> • IRFWCD — drainage permit <br /> • Indian River County Environmental Planning-Clearing and Tree Removal <br /> Permit, if required. <br /> 3 . Utilities: <br /> Page 6 of 13 <br /> C:ADocuments and Settings\hdeibel\Local Settings\Temporary Internet Files\0LK13AA43rd Avenue Arcadis Work <br /> Order No 2 Agrement O1 -29-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.