Laserfiche WebLink
Utility coordination with the various Utility Companies and/or agencies shall be by the <br /> ENGINEER and identified conflicts addressed. The ENGINEER will be prepared, at additional <br /> hourly rates, to survey the project site to locate and determine depth of underground utilities. in <br /> coordination with the Utility Companies . <br /> G. Construction Phase Assistance <br /> Construction Phase Assistance is not included in this agreement, but will be provided by the Engineer <br /> if requested by the County. The scope and fees for this work will be negotiated at a later date. <br /> H. Certification <br /> 1 . The ENGINEER will provide certification to IRFWCD, St. Johns River Water Management <br /> District and all other required Federal, State, and local permitting agencies based on As-Built <br /> drawings provided by the Contractor's licensed surveyor and information provided by the <br /> COUNTY. <br /> Page 7 of 13 <br /> C:\Documents and SettingsUideibeFLocal Settings\Temporary Internet Files\OLK13A\43rd Avenue Arcadis Work <br /> Order No 2 Agrement 01 -29-07.doc <br />