Laserfiche WebLink
percent completion level. If requested by the COUNTY, the CONSULTANT will meet with <br />the COUNTY to discuss the submittal and subsequently revise the drawings per the <br />COUNTY's comments. <br />2.3 100 Percent Design <br />At the 100 percent submittal, two sets of the drawings will be submitted together with an <br />electronic copy using AutoCADTM Release 2005 or later format. The 100 percent submittal <br />will also include bid schedule, table of contents, and technical specifications in electronic <br />Microsoft Word TM format. The CONSULTANT will prepare and submit an Engineer's <br />Opinion of Probable Construction Cost for the project at the 100 percent design level. <br />2.4 Conformed Sets <br />Conformed sets - After the project is bid but before the COUNTY awards the construction <br />contract, provide five signed and sealed copies of the conformed structural and electrical <br />contract drawings and five signed and sealed sets of the conformed technical <br />specifications. <br />3.0 BIDDING ASSISTANCE AND CONSTRUCTION SERVICES <br />The CONSULTANT will <br />provide bidding <br />assistance (including <br />pre-bid <br />conference) and <br />construction services at <br />an hourly rate as <br />requested in writing <br />by the <br />COUNTY. <br />"'END OF ATTACHMENT 1" <br />3 <br />P:\2240015 Rockridge Surge\Malcolm Pirnie Work Order #2-EM.doc <br />