Laserfiche WebLink
EXHIBIT "B" <br /> ESTIMATED COST OF IMPROVEMENTS <br /> FORCE MAIN <br /> IN 65TH STREET FROM OLD DIXIE TO WEST PROPERTY LINE <br /> 4/ 10/2006 <br /> ITEM DESCRIPTION QUANTITY UNIT OF UNIT PRICE TOTAL PRICE <br /> MEASURE <br /> Sewer Force Main <br /> 1 MOT 1 LS $ 2 , 500 .00 $2 , 500 . 00 <br /> 2 Mobilization 1 LS $ 5,000 .00 $5,000 .00 <br /> 3 16 X 6 Tap Sleeve & Valve 1 EA $ 49500 .00 $4 , 500 .00 <br /> 4 Restore Pavement & Sod 1 LS $ 12000 .00 $ 1 ,000.00 <br /> 5 14" Jack & Bore w/ 6" FM 108 LF $ 350 .00 $37 ,800.00 <br /> 6 6" Gate Valve 4 EA $ 750 .00 $3 ,000.00 <br /> 7 6" PVC Force Main 2689 LF $ 25.00 $67 ,225.00 <br /> 8 6" HDPE Directional Bore 120 LF $ 150 .00 $ 18,000.00 <br /> 9 4" Gate Valve 3 EA $ 500 .00 $ 1 ,500.00 <br /> 10 6 X 4 Tee 3 EA $ 700 .00 $2 , 100.00 <br /> 11 4" Plug 2 EA $ 200 .00 $400.00 <br /> 12 6" Plug 1 EA $ 300 .00 $300 .00 <br /> 13 Sod Right of Way 2689 LF $ 3 . 50 $9,411 . 50 <br /> 14 Testing 1 LS $ 3 ,000 .00 $3,000 .00 <br /> Total $ 155,736 .50 <br /> Contin enc 10% $15, 573 .65 <br /> Survey $3, 500 .00 <br /> Design $ 10,000 .00 <br /> Permitting $5,000 .00 <br /> Bidding & Award $2 ,000 .00 <br /> Services during constuction $5,000 .00 <br /> Administration $ 1 , 500 .00 <br /> Total $ 198,310 . 15 <br /> IN 65TH STREET FROM WEST PROPERTY LINE TO LATERAL G CANAL <br /> 4/10/2006 <br /> ITEM DESCRIPTION QUANTITY UNIT OF UNIT PRICE TOTAL PRICE <br /> MEASURE <br /> Sewer Force Main <br /> 1 MOT 1 LS $ 1 , 500 .00 $ 19500.00 <br /> 2 Mobilization 1 LS $ 3 ,000 .00 $3,000.00 <br /> 3 6" PVC Force Main 1215 EA $ 25 .00 $30,375 .00 <br /> 4 6" Gate Valve 1 LS $ 750 .00 $750 .00 <br /> 5 16 X 4 Tee 1 LF $ 700 .00 $700 .00 <br /> 6 4" Gate Valve 1 LF $ 500 . 00 $500 .00 <br /> 7 6" 45 Bends 2 LF $ 500 .00 $ 17000 .00 <br /> 8 4" Plug 1 EA $ 200 .00 $200 .00 <br /> 9 Sod Right of Way 1215 LF $ 3 .50 $4,252 .50 <br /> 10 Testing 1 LS $ 1 ,000 . 00 $ 12000.00 <br /> Total $43 ,277 . 50 <br /> Contingent @10% $42327 .75 <br /> Survey $1 ,200.00 <br /> Design $5,000 .00 <br /> Permitting $ 1 ,000 .00 <br /> Bidding & Award $ 1 ,000 .00 <br /> Services during constuction $2 ,000 .00 <br /> Administration $500 .00 <br /> Total $58 ,305 .25 <br /> County Share $58 ,305 . 25 <br /> Total Cost of Force Main : <br /> $ 198 , 310 . 15 + $58 ,305 .25 = $256 ,615.40 <br />