My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-017
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 1:15:12 PM
Creation date
9/30/2015 10:31:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/16/2007
Control Number
2007-017
Agenda Item Number
11.J.1
Entity Name
Schulke, Bittle and Stoddard LLC
Subject
Work Order No.3 Services Master Sanitary Sewer Force Main
Area
65th St. Old Dixie Highway west to Lateral G Canal
Supplemental fields
SmeadsoftID
6071
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br /> (Fee Schedule) <br /> Method and Amount of Compensation <br /> Schulke, Bittle & Stoddard, L.L .C . , proposes to provide the Scope of Work based on the <br /> following lump sum fees : <br /> Task 1 . Surveying and preparation of Base Plans $3 , 175 .00 <br /> (Note : Surveying will include establishment <br /> of a corridor for the proposed pipeline and plan <br /> and profile of the corridor.) <br /> Task 2. Engineering design, preparation of Construction $75945 . 00 <br /> Plans, Geotechnical report <br /> (soil borings- 1 / 750 ft + along route), <br /> preparation and submittal of Permitting <br /> Applications, and preparation of Specifications <br /> and Bid Documents utilizing Standard IRC Bid <br /> Documents . Forms, Documents and Drawings <br /> will be in electronic Format MS Word. <br /> Task 3 . Assistance during Bidding, Bid Evaluations, $ 14 ,320.00 <br /> Contract Award and Construction Administration <br /> and Periodic Administration and Periodic <br /> Construction/Field inspections . <br /> Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan <br /> sheets required for utility coordination and for copies of reports, drawings, specifications, <br /> bidding and construction contract documents, and other pertinent items required by <br /> federal, state and local agencies from whom approval of the project must be obtained, <br /> prospective bidders, material suppliers, and other interested parties, but may charge only <br /> for the actual cost of providing such copies based on the following tabulation : <br /> 8 1/2 " x 11 " $ 0.25/sheet Blue line prints $ 0 .333/SF <br /> I I ° x 17" $ 0. 50/sheet Reproducible sepias $ 0 . 75/SF <br /> 31 /2 " diskette $ 2 .00/each Reproducible mylars $ 1 .00/SF <br /> CD $ 4.00/each <br /> Application Fees <br /> The county shall make direct payment to our office for the actual cost of all construction <br /> permit application fees paid to jurisdictional agencies, including but not limited to : <br /> F .D. E .P., I.R. C. Engineering (Right-of-Way), I.R.F .W.C.D ., F .D . O.T. <br /> Attachment 2 <br /> Work Order No. 3 with Schulke, Bittle & Stoddard, L.L.C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.