My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-052
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 1:55:08 PM
Creation date
9/30/2015 9:31:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/14/2006
Control Number
2006-052
Agenda Item Number
11.J.1.
Entity Name
Brown and Caldwell
Subject
Work Order No. 3-Reclaimed Water System Implementation Plan
Supplemental fields
SmeadsoftID
5458
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
countywide reclaimed water transmission and distribution system , it would be preferable <br /> to have the entire County Urban Service Area designated as Reuse Service Area by <br /> FDEP . This would allow the County to provide reclaimed water service to individual <br /> residents in identified developments and other land uses without having to go through a <br /> permit modification process each time. To have the entire limits of the County <br /> designated as Reuse Service Area, however, it is necessary to prepare a Reclaimed Water <br /> Master Plan, identifying how the area in question will be provided with public access <br /> reclaimed water service and who the major reclaimed water users in the area are expected <br /> to be. <br /> PROJECT OBJECTIVE <br /> The overall objectives of this project are to perform the reclaimed water system master <br /> planning necessary for FDEP to designate one or more Reuse Service Areas in Indian <br /> River County and to establish an implementation strategy for providing reclaimed water <br /> service to individual homes and businesses in the County' s Urban Service Area. More <br /> specifically, project objectives include the following : <br /> • Develop a wastewater reuse strategy that is responsive to the County' s overall <br /> water resources needs, while addressing short-term requirements for effluent <br /> disposal capacity. <br /> • Identify the current and projected future availability and demand for reclaimed <br /> water, as well as the location of potential customers in relation to production <br /> facilities . <br /> • Identify feasible reuse alternatives, considering current and potential future markets <br /> for reclaimed water. <br /> • Develop a County-wide Reuse Service Areas in Indian River County so that a <br /> Permit for Reclaimed Water can be obtained for the entire area, from any of the <br /> County's four WWTFs. <br /> • Develop conceptual layouts and planning level cost estimates for low pressure, <br /> pressurized and hybrid reclaimed water delivery systems in each proposed Reuse <br /> Service Area <br /> • Identify a preferred approach for funding capital improvements required for <br /> reclaimed water system implementation. <br /> • Develop mechanisms for coordinating the technical and economic requirements of <br /> the reclaimed water system with the County' s ordinances and Comprehensive Plan . <br /> The following describes the work to be performed by BC in preparing the Indian River <br /> County Reclaimed Water System Implementation Plan. <br /> S:\041077 .003\IRC Reclaimed Water System Implementation PlamAttachment I .doe October I , 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.