Laserfiche WebLink
Our File #0626 <br /> April 13, 2006 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT l <br /> • Project Description <br /> Work Order No. 3 provides for professional engineering services for the design, permitting, bidding and <br /> services during construction of a 12" water main for conveyance of potable water in 17th Street SW <br /> between 27d' Avenue & 43`d Avenue. <br /> Work Order No. 3 is being implemented at this time to provide professional engineering services by <br /> Masteller & Moler, Inc. associated with the project described above. The work to be performed as part <br /> of this Work Order will generally include preparation of project design for the proposed 12" water <br /> pipeline, preparation of contract plans; preparation of specifications and bid documents; preparation and <br /> submittal of permit applications, assistance during bidding and contract administration/periodic <br /> inspection for the pipeline project. <br /> The estimated project construction cost is $625 ,000 . 00 <br /> A brief description of the scope of services for Work Order No. 3 is provided below: <br /> • Scone of Services <br /> Task A — Construction Plans <br /> Masteller & Moler, Inc. has received a route survey and base plans prepared by Masteller, Moler, Reed <br /> & Taylor, Inc. We shall use these base plans for design and preparation of construction plans for a 12" <br /> diameter water main. This project will connect to the existing 12" water main on 27d' Avenue and <br /> provide for construction of a 12" water main west along the north side of 17th Street SW with a <br /> directional bore under the Canal east of 43`d Avenue and connecting to the proposed 12 " water main on <br /> 43`d Avenue. The estimated length of the proposed 12" water main is 5 ,400 ' t . Our plans will show the <br /> necessary gate valves, air release valves, hydrants, directional boring, and construction details. <br />