My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-166
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 11:41:58 AM
Creation date
9/30/2015 9:42:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2006
Control Number
2006-166
Agenda Item Number
11.J.2.
Entity Name
Masteller and Moler, Inc.
Subject
Work Order No. 3 for professional consulting services
Area
17th St. SW between 27th Ave and 43rd ave
Supplemental fields
SmeadsoftID
5635
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0626 <br /> April 13, 2006 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT l <br /> • Project Description <br /> Work Order No. 3 provides for professional engineering services for the design, permitting, bidding and <br /> services during construction of a 12" water main for conveyance of potable water in 17th Street SW <br /> between 27d' Avenue & 43`d Avenue. <br /> Work Order No. 3 is being implemented at this time to provide professional engineering services by <br /> Masteller & Moler, Inc. associated with the project described above. The work to be performed as part <br /> of this Work Order will generally include preparation of project design for the proposed 12" water <br /> pipeline, preparation of contract plans; preparation of specifications and bid documents; preparation and <br /> submittal of permit applications, assistance during bidding and contract administration/periodic <br /> inspection for the pipeline project. <br /> The estimated project construction cost is $625 ,000 . 00 <br /> A brief description of the scope of services for Work Order No. 3 is provided below: <br /> • Scone of Services <br /> Task A — Construction Plans <br /> Masteller & Moler, Inc. has received a route survey and base plans prepared by Masteller, Moler, Reed <br /> & Taylor, Inc. We shall use these base plans for design and preparation of construction plans for a 12" <br /> diameter water main. This project will connect to the existing 12" water main on 27d' Avenue and <br /> provide for construction of a 12" water main west along the north side of 17th Street SW with a <br /> directional bore under the Canal east of 43`d Avenue and connecting to the proposed 12 " water main on <br /> 43`d Avenue. The estimated length of the proposed 12" water main is 5 ,400 ' t . Our plans will show the <br /> necessary gate valves, air release valves, hydrants, directional boring, and construction details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.