Laserfiche WebLink
' ' 1 <br /> agreement. Since the exact number of meetings cannot be predicted accurately, this task will be <br /> held as a contingency as per Task 1 . 1 . <br /> TASK 2. 0 - FDEP CONCEPTUAL ERP MODIFICATION <br /> Task 2 services are for the preparation and submittal of a revision the Florida Department of <br /> Environmental Protection (FDEP) Conceptual ERP . The Conceptual ERP will be modified to <br /> show the new flow pattern for the C-5 Canal negotiated in Task 1 of this proposal . A <br /> Conceptual ERP is required by the FDEP in order to abandon (fill) a portion of the C-5 Canal, <br /> and show the planned improvement of the onsite stormwater system at the IRC Landfill . <br /> Subtask 2. 1 Conceptual ERP Permit Minor Modification <br /> A minor modification to the Conceptual ERP will be required to change the flow provisions for <br /> the C-5 Canal . The current Conceptual ERP has the previous C-5 Canal to C-6 Canal bypass <br /> scenario . Since the land owned by SWDD west of I-95 will not be needed for the revised <br /> stormwater conditions, it will be taken out of the Conceptual ERP and not be tied to the <br /> Northern Expansion Area ERP. This also negates any development activity required by the <br /> previous Conceptual ERP on the western property . The minor modification of the Conceptual <br /> ERP will precede the Phase I Construction ERP . This task includes drafting time to update the <br /> existing plans to reflect the modeling which accommodates the C-5 flow onto the site . <br /> Subtask 2. 2 FDEP ERP Requests for Additional Information <br /> CDM will respond to up to two Requests for Additional Information (RAI) from the FDEP <br /> regarding the ERP Permit Application. The RAIs are not expected to require a significant effort. <br /> Subtask 2. 3 Meetings with IRC and the Regulatory Agencies <br /> This subtask includes up to three project related meetings with IRC staff to discuss design and <br /> permitting issues, as well as pre-application and application submittal meetings with FDEP. <br /> A-3 mh2276. doc <br />