My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-130
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:05:51 PM
Creation date
9/30/2015 9:39:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-130
Agenda Item Number
7.Q.
Entity Name
Creech Engineers, Inc.
Subject
Work Order No. 4- Fleming Street extension
Area
City of Sebastian/US 1, Old Dixie Highway
Project Number
0618
Supplemental fields
SmeadsoftID
5598
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C (`E E E H 4450 West 21 255 IN5434 eecn nc cccolm55- 775�a 32934 <br /> E " Ca � Ia EEI;? s <br /> CIVILIZATION ENGINEEr2E � <br /> April 7, 2006 <br /> 23101 . 04 (00) <br /> Michael O 'Brien, t S .M EXHIBIT l l /-� <br /> Indian River County Surveyor <br /> 1840 25th Street <br /> Vero Beach , FL 32960 <br /> RE : Fleming Street Extension <br /> Route / Design Survey <br /> Indian River County Continuing Land Survey Services Contract No. 0390 <br /> Project Specific No, 0618 <br /> Revision 2 <br /> Dear Mr. O ' Brien: <br /> Creech Engineers, Inc . (CEI) is pleased to submit this revised proposal to Indian River County <br /> (COUNTY) for professional surveying and mapping services. <br /> PROJECT UNDERSTANDING <br /> It is our understanding that the CITY of SEBASTIAN is extending Fleming Street east to U. S. Highway <br /> 1 . To help accomplish this, the COUNTY is assisting by providing Impact Fee funding and corridor <br /> alignment surveying and mapping services for planning and subsequent preliminary design <br /> applications . <br /> The COUNTY is requesting professional surveying and mapping services in support of Planning and <br /> Preliminary Engineering Design . The primary corridor limits are from 250 ' west of the existing east <br /> end of Fleming Street to 300 ' east of the centerline of U. S. Highway I near Landings Way, for an <br /> overall project length of approximately 7200 feet. The width of the primary corridor for surveying and <br /> mapping is 300 feet in un-improved areas and a restricted corridor shall apply within improved <br /> subdivisions. <br /> There is also a secondary corridor, which extends north from the primary corridor near the proposed <br /> concrete plant area approximately 1600 feet to the railroad crossing at Old Dixie Highway. <br /> Additional surveying will also be performed at the existing railroad crossing and the proposed railroad <br /> crossing 300 ' in each direction along the proposed route and the railroad line . <br /> At the proposed route intersection with U. S. Highway I additional survey work will be performed <br /> approximately 660 ' North & South and terminate at the Easterly Right-of-way line. <br /> >F:\Engineering\Capital Projects\0390-Annual Survey Contracts\Creech\2006\Fleming Ext. 06\0309 Fleming Ext. Creech IRC WO#4 -04-18-06- <br /> mobAcc <br />
The URL can be used to link to this page
Your browser does not support the video tag.