Laserfiche WebLink
SCOPE OF SERVICES <br /> We respectfully submit the following Scope of Services and Fee Schedule for your review: <br /> Task 1 — Meetings / Coordination <br /> CEI will attend all meetings critical to the performance and completion of the project. <br /> CEI will coordinate with land owners, railroad and other agencies for access to properties <br /> Task 2 — Preliminary Survey Baseline <br /> CEI will research local published records along with documentation provided by the COUNTY, this <br /> information will be used along with limited field measurements to compute a preliminary baseline for <br /> the length of the primary corridor to be used for cross sections. The preliminary baseline alignment <br /> plot will be supplied to the COUNTY for review. <br /> Task 3 — Primary Control <br /> • Primary Horizontal Control — CEI will establish a Horizontal Control Network, consisting of Ten <br /> ( 10) poured concrete monuments, along the corridor using Static GPS methods. The network shall <br /> meet or exceed the accuracy requirements for "Suburban " with the minimum relative distance <br /> accuracy for this type of horizontal control to be 1 foot in 7500 feet ( 1 : 7500) as classified in the <br /> "Minimum Technical Standards" for Surveying and Mapping in the State of Florida as set forth by the <br /> Florida Board of Professional Surveyors and Mappers in Chapter 61G17-6, Florida Administrative <br /> Code Pursuant to Section 472.027 Florida Statutes. CEI Crews will reconnoiter published horizontal <br /> control surrounding the project corridor. New stations will be set in inter-visible pairs outside of the <br /> corridor where there is satellite visibility, and shall be referenced to the final corridor alignment. <br /> • Primary Vertical Control - CEI will establish a Vertical Control Network along the corridor using 3 - <br /> wire differential leveling technique relative to the NGVD29 elevations for the benchmarks provided <br /> by the COUNTY. The network will meet or exceed the accuracy requirements for vertical control <br /> based on the "Minimum Technical Standards" for surveying and mapping in the State of Florida as <br /> set forth by the Florida Board of Professional Surveyors and Mappers in Chapter 61G17-6, Florida <br /> Administrative Code, pursuant to Section 472-027, Florida Statutes. <br /> • New vertical control stations will be set approximately every 1500 ' and shall be referenced to the <br /> final corridor alignment. <br /> • Primary control shall provide the horizontal (NAD 83/99) and vertical control (NGVD 29) values. <br /> Task 4 — Secondary Control <br /> Secondary Horizontal and Vertical Control — CEI will establish secondary traverse control along the <br /> corridor using RTK GPS and conventional survey methods. The secondary control will be used to <br /> support cross-sections and topographic mapping efforts, and shall be referenced to the final corridor <br /> alignment. <br /> Task 5 — Cross Sections / Supplemental Planimetrics <br /> Cross sections every 100 ' will be located on each side of the preliminary survey baseline along the <br /> primary corridor and along the existing road north near the proposed concrete plant. Cross sections <br /> shall vary in length; being a +/- 300 ' corridor (estimated 150 ' +/- from baseline) in "un-improved" <br /> areas and +/- 25 ' over existing property/subdivision lines (or as needed) into "improved" lots or lands <br /> in an effort to supply adequate data to determine flow patterns. All home and/or structure (i.e . <br /> detached sheds/garages) finish floor elevations (low floor) shall be obtained (see attached sketch) . <br /> CEI will supplement aerial planimetric data within corridor for obscured areas. <br /> CEI will locate above ground utilities within the corridor. <br /> >F:\Engineering\Capital Projects\0390-Annual Survey Contracts\Creech\2006\Fleming Ext. 06\0309 Fleming Ext. Creech IRC WO#4 -04-18-06- <br /> mob.doc <br />