My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-249
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:57:08 PM
Creation date
9/30/2015 9:52:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2006
Control Number
2006-249
Agenda Item Number
11.J.1
Entity Name
Masteller and Moler, Inc.
Subject
Work Order #4-Lateral G Force Main to Reuse Main
Area
North County Wastewater Treatment Plant
Supplemental fields
SmeadsoftID
5735
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0627LA <br /> June 16, 2006 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT 1 <br /> • Project Description <br /> Work Authorization #4 provides for professional engineering services for preparation of a plan of <br /> action and tasks to convert an 8" wastewater force main into a reuse main. <br /> Masteller & Moler, Inc. will utilize its expertise on wastewater force main conversion into reuse <br /> mains relative to the 8" pipeline between the North and Central WWTP along Lateral G Canal. We <br /> will conduct site visit(s); prepare plans, specifications and bid documents to transform the force <br /> main into a reuse main including: cleaning, disinfecting, leak detection, valve checking and <br /> hydrostatic testing. Included in our services will be detail plans showing the piping connection to <br /> the 12 " reuse line at the North County WWTP site and the 16" reuse line at the Central County <br /> WWTP site. We will also prepare the FDEP permit application as well as bidding and services <br /> during construction. <br /> The Estimated Cost of the Project is $275,000. 00 <br /> A brief description of the scope of services and deliverables for Work Authorization 94 is provided <br /> below: <br /> • Scope of Services <br /> Task A — Contract Plans/Specifications <br /> Masteller & Moler, Inc. will meet with County staff, conduct site visits along the existing 8" force <br /> main route; prepare construction plans; project specifications; prepare a plan of action; and prepare <br /> bid documents to convert the existing 8" force main into a reuse main. Contract plans will show the <br /> method of connection to the existing reuse system piping on the North Regional and Central <br /> Regional Wastewater Treatment Plant ends of the pipeline. Our services will include preparation of <br /> permit applications. <br /> (H \Projects\0627\ADMIMContracts\0627_Attachment I_rev.061606.doc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.