My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-249
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:57:08 PM
Creation date
9/30/2015 9:52:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2006
Control Number
2006-249
Agenda Item Number
11.J.1
Entity Name
Masteller and Moler, Inc.
Subject
Work Order #4-Lateral G Force Main to Reuse Main
Area
North County Wastewater Treatment Plant
Supplemental fields
SmeadsoftID
5735
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> 6/5/2006 <br /> Page 2 <br /> Task B — Construction Services <br /> Masteller & Moler, Inc. will provide assistance during bidding and periodic inspection of the <br /> pipeline conversion project on an as needed basis to observe that construction is in reasonable <br /> compliance with contract plans and specifications. Observations of pipe cleaning, disinfection, leak <br /> detection, valve checking and hydrostatic testing will be conducted by our staff to assure the County <br /> Utilities is getting a good job. <br />
The URL can be used to link to this page
Your browser does not support the video tag.