My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-241
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:53:48 PM
Creation date
9/30/2015 8:58:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/12/2005
Control Number
2005-241
Agenda Item Number
11.J.3
Entity Name
Post, Buckley, Schuh and Jernigan,Inc.
Subject
Work Order No.5 Services
Expansion West Regional WWTF
Supplemental fields
SmeadsoftID
5081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> WORK ORDER NUMBER 05 <br /> TO 2004 PROFESSIONAL SERVICES AGREEMENT <br /> FOR <br /> EXPANSION OF WEST REGION WWTF <br /> INDIAN RIVER COUNTY <br /> I. General <br /> The existing West Region WWTF is a two- stage BNR plant designed around the Kruger <br /> A/O ditch process . The first stage was designed as a fermentation tank for phosphorus <br /> removal . The plant also has RAS denitrification capabilities using some of the tankage <br /> from an older plant that is no longer in use . <br /> Existing Treatment Process Flow Diagram <br /> Anaerobic Aerobic <br /> Anoxic RAS WAS <br /> Current Plant Process Schematic <br /> The RAS denitrification process is not being operated as intended and partial <br /> denitrification is being achieved in the existing "ditch" . A brief description of the <br /> existing plant is as follows : <br /> • Preliminary treatment consisting of screening and grit removal <br /> • A 116 ,000- gallon , four compartment anaerobic fermentation tank equipped with <br /> four mixers <br /> • A 1 . 5 MG oxidation ditch ( 15 ' SWD) equipped with three two speed 60/40 <br /> horsepower brush aerators , two submerged propeller mixers , and a motor operated <br /> effluent weir <br /> • Two 70—foot diameter by 12—foot deep secondary clarifiers fed from an influent <br /> splitter box <br /> • A two compartment RAS denitrification tank equipped with four submersible <br /> mixers <br /> • A traveling bridge effluent filter <br /> • Dual chlorine contact chambers <br /> • Two RAS pumps and one WAS pump <br /> • Chemical feed systems for alum and sodium hypochlorite <br /> • An off line equalization basin <br /> • Two , 116 , 000 gallon , aerated sludge holding tanks <br /> IRC West WWTF Scope Page 1 6 13/2005 <br /> CADocuments and SettingAkdonlevy\Local SettingATemporary Internet Fi1es\0LK20ffWTPEXPNASI0N Design Scope-Rqj Revised by RRM .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.