My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-241
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:53:48 PM
Creation date
9/30/2015 8:58:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/12/2005
Control Number
2005-241
Agenda Item Number
11.J.3
Entity Name
Post, Buckley, Schuh and Jernigan,Inc.
Subject
Work Order No.5 Services
Expansion West Regional WWTF
Supplemental fields
SmeadsoftID
5081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> • A rotary drum thickener to thicken the "undigested" sludge prior to hauling off- <br /> site for further treatment and land application <br /> The following scope of work is to expand the plant to 6 -MGD (AADF) and t achieve plant <br /> effluent TP and TN concentrations of 0 . 75 mg/1 and 6 mg/l , respectively on an annual <br /> average , consistent with the wetlands permit conditions . Influent design loadings need to be <br /> confirmed, but we believe that the following represents reasonable basis of design based on <br /> our review of the data : <br /> Parameter Value <br /> Influent Flow , MGD AADF 6 . 0 <br /> Influent Flow , MGD Maximum Month 7 . 8 <br /> Influent Flow , MGD Peak Hour 18 . 0 <br /> Influent BODS , Mg/1 250 <br /> Influent TSS , mg/1 200 <br /> Influent TN, m l 40 <br /> Influent TP , mg/1 8 <br /> Effluent BODS , mg/1 Annual Average(l ) 10 <br /> Effluent TSS , mg/1 Any Sample(2) 5 <br /> Effluent TN, mg/1 Annual Average( l ) < 6 <br /> Effluent TP , m l Annual Average( l ) 0 . 75 <br /> Table Notes : <br /> ( 1 ) Annual Average Wetlands Discharge <br /> (2) Any Sample Discharge to Reclaimed Water Reuse <br /> PBS &J will provide design , permitting and construction phase services for thim. expansion of <br /> the West Regional WWTP from 2 MGD to 6 MGD . The needed facilities will include <br /> construction of a new 3 . 0 MGD 5 - stage treatment train and retrofitting of the existing 2 <br /> MGD train to 3 . 0 MGD 5 -stage treatment train . The project would generally provide for <br /> new pretreatment structure , common anaerobic selector tank , common first anoxic tanks , <br /> new aeration basin , new blower building , retrofitting of existing oxidation ditch , common <br /> 2nd anoxic tanks common re-aeration tanks , two new clarifiers , three traveling bridge sand <br /> filters , chlorine contact tanks , additional rotary drum thickener and wetland <br /> recirculation/return pump station . Consulting services for this project sha 1 be provided <br /> under this Work Order and will focus on the following general objectives : <br /> A . Final design , permitting , and bidding services for the needed facilities . <br /> B . Construction administration and observation for designed facilities <br /> C . Start up , O&M manuals , operations assistance , and training (To be negotiated as a <br /> separate amendment when/if requested by County) . <br /> IRC West WWTF Scope Page 2 61312005 <br /> CADocuments and SettingAkdonlevy\Lorul SettingATemporary Internet Fi1eA0LK20sWWTPEXPNASI0N Design Scope-Rqj Revised by RRM .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.