My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-241
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:53:48 PM
Creation date
9/30/2015 8:58:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/12/2005
Control Number
2005-241
Agenda Item Number
11.J.3
Entity Name
Post, Buckley, Schuh and Jernigan,Inc.
Subject
Work Order No.5 Services
Expansion West Regional WWTF
Supplemental fields
SmeadsoftID
5081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . A new pretreatment structure (two (2) mechanically cleaned screens , <br /> Screening conveyor/compactor, bypass provisions manual screens) <br /> 2 . Common anaerobic selector tanks and mixers <br /> 3 . Common first anoxic tanks and mixers <br /> 4 . Aeration tanks/ basins utilizing fine bubble diffused aeration <br /> 5 . A concrete block blower building with louvers , roll - up dooi s and a bridge <br /> crane <br /> 6 . Retrofitting of existing oxidation ditch to fine bubble diffused aeration <br /> 7 . Common 2nd anoxic tanks and common re- aeration tanks <br /> S . Clarifiers with RAS and WAS pumps <br /> 9 . Filters (Traveling bridge type) <br /> 10 . Chlorine contact basins and associated chlorine feed equipment <br /> 11 . Wetlands/ recirculation/ return pump station and force main (f rom discharge <br /> end and not from canals to the influent side of the wetlands) <br /> 12 . Emergency power generator in a building . A prefabricated concrete building <br /> is assumed as the basis of design in the scope <br /> 13 . New rotary drum thickener and associated equipment with polymer feed <br /> system located adjacent to the existing thickener (slab on grade) <br /> 14 . Instrumentation and controls with plant SCADA system modification <br /> B . Up to six sets of progress bidding documents (plans and specifications conforming to <br /> CSI format) and an associated construction cost estimate will be su mitted to the <br /> County for review at approximately the 30 % and 60 % levels of proje Nt completion . <br /> Engineering drawings and specifications will be prepared using Autc CAD Version <br /> 2000 or higher or Microstation and MS Word . Up to six sets (h rd copies) of <br /> progress plans and specifications and an associated construction cost estimate will be <br /> submitted to the County for review at approximately the 90 % level of project <br /> completion . County will provide Division 0 Bidding and contract documents . <br /> IRC West WWTF Scope Page 4 613/2005 <br /> CADocuments and SettingsWonlevy\Iocal SettingsVemporary Internet Fi1es1OLK20 WWTPEXPNASION Design Scope-ft Revised Gy RRM .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.