My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-241
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:53:48 PM
Creation date
9/30/2015 8:58:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/12/2005
Control Number
2005-241
Agenda Item Number
11.J.3
Entity Name
Post, Buckley, Schuh and Jernigan,Inc.
Subject
Work Order No.5 Services
Expansion West Regional WWTF
Supplemental fields
SmeadsoftID
5081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . County/County site plan approval for the wastewater treatment plant . <br /> 4 . An ERP permit is not anticipated to be required and is not included. It is <br /> anticipated that due to addition of mainly open tanks only a letter <br /> modification of the existing Storm water permit may be reqL ired . <br /> 5 . USACOE Dredge & Fill Permit is assumed to not be required for this project. <br /> 6 . No wetland treatment permitting is required for this expansion due to <br /> additional effluent disposal being derived from expanded reuse system <br /> 7 . No ecological permitting is anticipated along pipeline routes and is not <br /> included in this scope . <br /> Included in above permit applications is provision for up to two (2) request for additional <br /> information (RAI) responses for each of the permits . <br /> The County shall pay directly all necessary permitting fees . <br /> VI. Field Survey Services <br /> No detailed field survey is anticipated or included in the scope . It is assumed that limited <br /> verification of key elevation will be sufficient and an allowance of $ 5 ,000 is included in <br /> the scope . <br /> VII. Soils and Geotechnical Services <br /> Consultant will subcontract for soils testing and geotechnical services to i professional <br /> Geotechnical subconsultant . The proposed plant construction includes he following <br /> anticipated unit processes : <br /> 1 . Anaerobic Tanks <br /> 2 . First anoxic tanks <br /> 3 . Oxidation Ditch <br /> 4 . Second anoxic tanks and reaeration <br /> 5 . Clarifiers <br /> 6 , Filter Cell Structure <br /> 7 . Chlorine Contact Basin/Wet Well <br /> 8 . Thickener pad . <br /> 9 . Generator pad <br /> 10 . Wetland Return/recycle Pump Station <br /> Materials testing during construction is not included in this work order. It can be either <br /> required of the Contractor or provided in a separate work order. <br /> IRC West WWTF Scope Page 6 6/ 1312005 <br /> CADocuments and SettingAkdonlevy\Loral SettingsVemporary Internet Fi1es\0LK20sW WPPEXPNAS/0N Design Scope-Ryy Revised by RRM .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.