My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-241
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:53:48 PM
Creation date
9/30/2015 8:58:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/12/2005
Control Number
2005-241
Agenda Item Number
11.J.3
Entity Name
Post, Buckley, Schuh and Jernigan,Inc.
Subject
Work Order No.5 Services
Expansion West Regional WWTF
Supplemental fields
SmeadsoftID
5081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII . Construction Phase Services <br /> 1 . After written authorization to proceed with the construction phaso services , the <br /> Consultant shall : <br /> a. Conduct a pre-construction conference with the selected Contractor(s) , <br /> subcontractors , and County; and provide up to ten additional sets of Contract <br /> Documents for the Contractor' s use . <br /> b . Consult with and advice the County in the administration oft e construction <br /> contracts . The County will provide full -time representative(s ) at the <br /> construction sites as an alternative full time representation could be provided <br /> by the Consultant under a separate work order. <br /> C , Visit the project site at intervals appropriate to the various stages of <br /> construction as the Consultant deems necessary to observe the progress and <br /> quality of the construction and its general conformance with the Contract <br /> Documents ; notify the County of observed work which does not conform to <br /> the Contract Documents , make recommendations to the County for its <br /> correction , and, when authorized by the County, issue instructions to the <br /> Contractor(s) through the County ' s representative to carry out the corrective <br /> measures . A 16-month construction period is used as the basi of scopes this <br /> task. This work order assumes that two site visits per month will be provided <br /> with an additional 12 site visits for rebar inspection , for a total of 44 site <br /> visits . <br /> d . Provide interpretation or clarification of the design doc iments when <br /> requested, and prepare change orders required for clarifica ion or minor <br /> modification of the Contract Documents prepared by the Consultant . <br /> e . Review shop drawings and other required Contractor submittals , up to two <br /> times per submittal , for general conformance with the Contra t Documents . <br /> f. Review the Contractor(s ) ' applications for payment and the accompanying <br /> data and schedules , determine the amounts owed to the Contractor( s ) , and <br /> advise the County of the recommended payments to the Contractor( s ) . <br /> g . Conduct final site visits to determine if the work has been completed in <br /> substantial accordance with the Contract Documents and if the Contractor(s) <br /> has (have) fulfilled its (their) obligations there under so that the Consultant <br /> may recommend that the County make final payment to the Contractor(s ) . <br /> h . Prepare one set of reproducible record drawings for the County incorporating <br /> those changes made during construction , based on information furnished to <br /> the Consultant by the County . <br /> IRC West WWTF Scope Page 7 6/ 13/2005 <br /> CADocuments and Settings\kdon(evv\Loca! Settings\Temporary Internet Files\OLK20MWPPEXPNASION Design Srope-Raj Revised by RRM .dor <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.