Laserfiche WebLink
H. Monitoring wells: The FDEP may require the installation of monitoring wells down - <br />gradient to the C&D cell. The allowance item is for two well clusters with shallow and <br />intermediate wells. CDM will endeavor to reduce the number of wells by using existing <br />downgradient wells. However, this allowance is for the worst case scenario, in the event <br />that two clusters are required. If this allowance is exceeded because of more stringent <br />requirements from the FDEP, CDM may require an amendment to this work order. <br />CDM will provide supervision services over the installation of the monitoring wells. <br />LIMITATIONS OF AUTHORITY <br />1. Project Representative shall have limitations as follows: <br />a. Shall not authorize any deviation from the Design Documents or substitution of <br />materials or equipment, unless authorized by CDM <br />b. Shall not exceed limitations of CDM's authority as set forth in the Agreement of <br />the Design Documents <br />C. Shall not undertake any of the responsibilities of the OWNER, subcontractors or <br />the OWNER's superintendent <br />d. Shall not advise on, issue directions relative to, or assume control over any aspect <br />of the means, methods, techniques, sequences, or procedures of construction <br />unless such advice or directions are specifically required by the Design <br />Documents <br />e. Shall not advise on, issue directions regarding, or assume control over, safety <br />precautions and programs in connection with the work <br />f. Shall not accept shop drawing or sample submittals from any one other than the <br />OWNER <br />g. Shall not participate in specialized field or laboratory tests or inspections <br />conducted by others except as specifically authorized by CDM <br />A-5 mh2431.doc <br />