My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-078
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 12:54:48 PM
Creation date
9/30/2015 10:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/20/2007
Control Number
2007-078
Agenda Item Number
14.B.4
Entity Name
Geosyntec Consultants,Inc.
Subject
Work Order No.7 Three years of MPIS
Groundwater Plume Monitoring
Area
South Gifford Road Landfill
Supplemental fields
SmeadsoftID
6196
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Polly Kratman <br /> 25 January 2007 <br /> Page 3 <br /> • assess the impact of biological and physical natural attenuation processes on CVOC plume <br /> degradation. <br /> Based on the data presented in the semi-annual groundwater monitoring reports for the plume <br /> monitoring network, Geosyntec was successful in obtaining FDEP approval for reduced sampling <br /> frequency for some of the plume monitoring network wells. As requested by IRC SWDD, <br /> Geosyntec installed six monitoring wells (out-of-scope) required by FDEP and to evaluate the <br /> lateral and vertical extent of the CVOC plume to the north of the landfill. <br /> PROPOSED SCOPE OF WORK <br /> Geosyntec developed a phased approach with internal task elements to accomplish this work in <br /> an organized and cost-effective manner. The remainder of this letter provides a description of <br /> the proposed scope of work and a budget estimate to accomplish the work described herein. <br /> Task 1 — Project Management/Meetings <br /> Under this task, Geosyntec will perform project planning and management responsibilities, such <br /> as correspondence with IRC and FDEP , invoice review, project coordination, and project <br /> administration. Geosyntec has also included budget for preparation and attendance (by two <br /> Geosyntec personnel) at one meeting with IRC and/or FDEP, as needed. <br /> Task 2 — Field Activities <br /> Under this task, Geosyntec will perform all field activities related to the MPIS and plume <br /> groundwater monitoring, as discussed herein. The field activities will include : (i) field <br /> preparation; (ii) groundwater sampling; and (iii) water level measurements. Geosyntec will <br /> conduct field preparation activities, such as scheduling and staffing, subcontracting, and field <br /> equipment preparation. In addition, we will coordinate with Columbia Analytical Services <br /> (CAS), the analytical laboratory contracted with IRC, regarding laboratory analyses required by <br /> FDEP . <br /> Geosyntec will perform the groundwater sampling activities associated with the MPIS network <br /> and the CVOC plume monitoring wells . Groundwater sampling activities will be executed using <br /> a two-person sampling crew and will be performed in accordance with the FDEP SOPs . Each <br /> field event is budgeted to be completed within approximately seven days for the entire well <br /> network (including 71 monitoring wells from both the MPIS and plume monitoring networks). <br /> XR07014JR70003.doc <br /> engineers I scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.