Ms. Polly Kratman <br /> 25 January 2007 <br /> Page 4 <br /> Consistent field documentation and field protocols will be utilized to develop reliable data to <br /> support the exit strategy and/or natural attenuation approach for the project. <br /> Geosyntec will conduct a complete round of groundwater level measurements coincident with <br /> each semi-annual groundwater sampling event. Depth to groundwater measurements will be <br /> recorded to the nearest 0. 01 -ft in the MPIS and CVOC plume monitoring network wells, <br /> including existing monitoring wells and applicable City of Vero Beach wells . <br /> Task 3 — Data Evaluation <br /> Under Task 3 , Geosyntec will perform data evaluation activities for the MPIS and CVOC plume <br /> monitoring reporting. These activities will include database management, data evaluation and <br /> screening, and geographical information systems (GIS) figure preparation. <br /> Task 4 — MPIS Reporting <br /> The results of groundwater sampling under the MPIS will be presented in a report supported by <br /> attachments containing Chain-of-Custody sheets, field notes and observations, water sampling <br /> logs, maps, analytical results, and any other applicable materials. These reports will be prepared <br /> under Task 4 and will be submitted to IRC for review prior to submittal to FDEP . According to <br /> the MPIS , monitoring test results must be submitted to FDEP within sixty (60) days of receipt of <br /> the analytical data from the laboratory. <br /> Task 5 — CVOC Plume Monitoring Reporting <br /> The results of groundwater sampling associated with the CVOC plume monitoring will be <br /> presented in a report supported by attachments containing Chain-of-Custody sheets, field notes <br /> and observations, water sampling logs, maps, graphs , analytical results, and any other applicable <br /> materials. This report will be prepared under Task 5 and will be submitted to IRC for review <br /> prior to submittal to FDEP . <br /> BUDGET ESTIMATE <br /> The budget estimate for the proposed activities described herein for a three year period is <br /> provided as Attachment 2. The budget is as follows : <br /> Task 1 — Project Management/Meetings $ 18, 789 <br /> Task 2 — Groundwater Sampling $94, 599 <br /> XR070 L4AR70003 .doc <br /> engineers I Scientists I innovators <br />