Laserfiche WebLink
It is anticipated that the beach profile and borrow site surveys will be performed by the contractor. <br /> The aerial photography will be conducted under a separate work order. <br /> ATM will provide the County with one draft report for review, and distribute final copies to the <br /> County and regulatory agencies. <br /> Future Tasks <br /> The issued FDEP and USACE permits require physical and biological monitoring of the project for <br /> a minimum of three years. It is assumed that the monitoring requirements will not change, and <br /> estimated fees are based on the relevant tasks of this Scope of Work with a 5% increase to <br /> account for estimated increases for labor and equipment rates. Since beach profile and borrow <br /> site surveys were not a part of this scope, comparable fees were used in the estimate of future <br /> monitoring . <br />