My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-257
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:23:04 PM
Creation date
9/30/2015 11:01:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/24/2007
Control Number
2007-257
Agenda Item Number
14.B.6
Entity Name
Geosyntec Consultants, Inc.
Subject
Landfill gas-to-energy project/SWDD
Work Order No.8
Area
IRC Landfill
Supplemental fields
SmeadsoftID
6482
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E . <br /> 19 June 2007 <br /> Page 2 <br /> The IRCL Class I Landfill has a voluntarily-installed gas collection and control system (GCCS) <br /> that actively collects gas from Segment 1 , Segment 2, and the Infill area. The GCCS covers the <br /> entire closed area and portions of the active area of the landfill, and terminates with a control <br /> system consisting of a blower followed by a flare. The GCCS is presently collecting and flaring <br /> approximately 750 standard cubic feet per minute (scfm) of LFG . This quantity is expected to <br /> increase as the LEG collection system is expanded to the uncontrolled areas of the landfill cell . <br /> The SWDD desires to enter into a partnership arrangement with a qualified private entity, <br /> selected through a competitive bid, to implement and operate a LFGTE recovery system or LEG <br /> utilization system at the IRCL facility. The selected entity will be expected to finance, build and <br /> operate the energy recovery facility, and compensate SWDD for the LEG. To proceed <br /> expeditiously with the implementation of this plan, SWDD intends to retain consulting services <br /> to support its effort to define the project scope and projections, to identify alternative suitable <br /> energy markets and to administer the procurement mechanism to select and contract with a third- <br /> party entity to implement and operate the LFGTE or LFG utilization facility. This Work <br /> Authorization addresses Geosyntec' s understanding of the scope of services required to support <br /> SWDD in developing this project. <br /> PROPOSED SCOPE OF WORK <br /> Geosyntec anticipates this project will be performed under two main phases : (i) Procurement <br /> Phase ; and (ii) Construction Phase. The scope of services for the Procurement phases consists <br /> of four tasks as described in detail below . The scope of services and budget estimate for the <br /> Construction phase is not included iD this Work Authorization. Geosyntec will provide SWDD <br /> with the scope of services and budget estimate after award of contract and prior to construction. <br /> The four tasks for the Procurement phase consist of the following: <br /> • Task 1 : General Consulting/Meeting Support/Project Management; <br /> • Task 2 : LFG Generation, Projections and Energy Content ; <br /> • Task 3 : Identify and Quantify Suitable Energy Markets ; and <br /> • Task 4 : Preparation of RFP and Support during Procurement. <br /> Each of these tasks is described in detail below. <br /> XL071I9/1L70087.do <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.