Laserfiche WebLink
. II , <br /> ATTACHMENT 1 <br /> Task A <br /> 8th Street Forcemain <br /> Indian River Blvd to King ' s Highway (58th Avenue) <br /> Proiect Description and Understanding <br /> Construction of a new forcemain along 8"' Street to serve primarily as transmission main is needed to <br /> redirect flows from the South Regional WWTP to the West Regional WWTP . The scope of work will <br /> include approximately 22 ,000 linear feet of 12" forcemain from Indian River Blvd to Kings Highway <br /> (58 "' Avenue) . It is anticipated that several areas may require horizontal directional drill (HDD) and/or <br /> jack and bore (J&B ) construction techniques in congested areas , such as US- 1 and FEC railroad areas . <br /> Coordination with Task E which includes another forcemain to relieve the master pump station at the <br /> South RO plant will be included under this scope , such that a portion of 8"' Street will include another <br /> dual or enlarged forcemain . <br /> SCOPE OF SERVICES <br /> Consultant will provide survey , design, permitting, and construction phase services for the new <br /> forcemain . Consultant will provide survey along 8"' Street, design of the forcemain , preparation of <br /> project drawings and specifications for the project, which can be advertised for bidding by general <br /> contractors . Consultant will prepare and submit the appropriate permits listed herein for the construction <br /> of the project . Consultant will provide construction phase services during construction , and provide final <br /> certification of the project . The scope includes the following : <br /> Task 1 — Survey <br /> Survey limits along 8 "' Street will be from Indian River Blvd west to King ' s Highway . Survey <br /> information will only be provided on the side of the roadway within the right-of-way which the forcemain <br /> will be constructed . <br /> Consultant will import GIS information provided by Indian River County property appraisers department <br /> for establishment of right-of-way lines and overlay these on Indian River County aerials . Limited right- <br /> of-way control is anticipated . Areas with questionable R/W information where the proposed forcemain <br /> alignment must be located will be detailed and researched to establish right-of-way control . Several <br /> areas along the alignment will be researched with additional areas provided as an additional scope . <br /> Limited topographical information will be provided to augment aerial information . <br /> The survey will include the location of above ground information lying within the right of way of 8h <br /> Street . Surface evidence of underground utilities will be located. Cross -section elevations will be obtained <br /> at 200 ' intervals and visible high and low areas and extend across the right of way . Any record <br /> information deemed useful will be included on the piping plans . Baseline stationing will be established <br /> for the alignment. <br /> Underground locates will be provided at critical areas where conflicts may exist , tie-in locations , and in <br /> known congested areas , such as US 1 and FEC railroad crossing . <br /> Task 2 - Design <br /> Existing utility information provided by IRC and others will be used in conjunction with the survey <br /> HAGenerahMillerUndian River County\Proposals\Task A - 8th Street Forcemain .doc <br />