My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-174
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 1:17:15 PM
Creation date
9/30/2015 8:47:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2005
Control Number
2005-174
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates,Inc.
Subject
Work Order No.8 Master Planned Force Main
Design and Construction Services
Area
8th St. from I.R. Boulevard to 58th Ave.
Supplemental fields
SmeadsoftID
4952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> information as a basis for design of the piping alignment . <br /> The design will include hydraulic capacity calculations for the pipe included under this scope only . <br /> Preliminary alignment of the piping will be included and a review meeting with IRC staff will be <br /> conducted to review the alignment before final design of plan drawings will be prepared . <br /> Preparation of construction drawings will include plan sheets with survey information, key sheets , HDD <br /> and/or J&B staging areas , and details . It is assumed that plan only (no profile) with 1 "= 40 ' scale will be <br /> prepared which is approximately 24 to 26 drawings . Detail drawings of the HDD areas will be prepared <br /> with profile information . Consultant will provide copies of technical specifications , full size (2406) and <br /> half size ( 11x17 ) drawings for bidding and construction . All plans and technical specifications will be <br /> provided to the Owner in electronic format (AutoCAD 2000 / MS Word, respectively) at the end of the <br /> project. The technical specifications and standard details will be based on the Owners current Utility <br /> Standards . <br /> Task 3 — Permitting <br /> It is assumed that the following permits will be required : <br /> 0 County right-of-way permit <br /> 0 FDEP General Permit ( 62-604 . 3000( 8)( a)) <br /> • FEC Permit <br /> • Florida DOT R/W permit <br /> Consultant will prepare and submit a FDEP permit application 62-604 . 3000( 8 )(a) for the collection <br /> system modifications . The permit application fee of $500 will be included under this scope and paid by <br /> Consultant . Consultant will submit the permit application when the drawings and specifications are <br /> complete . Consultant will respond to one request for additional information (RFI' s ) from FDEP . <br /> Due to work which will be performed within 8`t' Street right of way , we will prepare and coordinate IRC <br /> R/W review permit and respond to questions regarding same . It is assumed that any fees associated with <br /> this permit will be waived and/or handled through interoffice coordination . <br /> Coordination with FEC regarding work in their R/W will be provided and permit application will be <br /> prepared and submitted . Coordination with FDOT regarding work in the US 1 right of way will also be <br /> provided and necessary information will be submitted to FDOT for this project . <br /> Task 4 —Construction Phase Services <br /> Consultant will provide construction phase services for this project , including bidding and contract <br /> administration , shop drawing review , coordination and meeting attendance , construction observation , <br /> coordination of record drawings , including electronic format in AutoCadd 2000 version in real world <br /> coordinates on CD , mylars , and final certification of completion of the project. It is anticipated that the <br /> duration of construction phase (notice to proceed to final completion) will be six (6) months and that on- <br /> site construction observations will be as appropriate with the level of construction activity . <br /> Consultant will answer contractor questions and prepare addendums , as needed which will be distributed <br /> to all the contract document holders . Consultant will attend a pre -bid meeting at the project site or main <br /> office . Consultant will sell project manuals from our office , including drawings , specifications , and <br /> generation of all addendums . <br /> HAGeneral\Miller\hidian River County\Proposals\Task A - 8th Street Forcemain.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.