a <br /> information as a basis for design of the piping alignment . <br /> The design will include hydraulic capacity calculations for the pipe included under this scope only . <br /> Preliminary alignment of the piping will be included and a review meeting with IRC staff will be <br /> conducted to review the alignment before final design of plan drawings will be prepared . <br /> Preparation of construction drawings will include plan sheets with survey information, key sheets , HDD <br /> and/or J&B staging areas , and details . It is assumed that plan only (no profile) with 1 "= 40 ' scale will be <br /> prepared which is approximately 24 to 26 drawings . Detail drawings of the HDD areas will be prepared <br /> with profile information . Consultant will provide copies of technical specifications , full size (2406) and <br /> half size ( 11x17 ) drawings for bidding and construction . All plans and technical specifications will be <br /> provided to the Owner in electronic format (AutoCAD 2000 / MS Word, respectively) at the end of the <br /> project. The technical specifications and standard details will be based on the Owners current Utility <br /> Standards . <br /> Task 3 — Permitting <br /> It is assumed that the following permits will be required : <br /> 0 County right-of-way permit <br /> 0 FDEP General Permit ( 62-604 . 3000( 8)( a)) <br /> • FEC Permit <br /> • Florida DOT R/W permit <br /> Consultant will prepare and submit a FDEP permit application 62-604 . 3000( 8 )(a) for the collection <br /> system modifications . The permit application fee of $500 will be included under this scope and paid by <br /> Consultant . Consultant will submit the permit application when the drawings and specifications are <br /> complete . Consultant will respond to one request for additional information (RFI' s ) from FDEP . <br /> Due to work which will be performed within 8`t' Street right of way , we will prepare and coordinate IRC <br /> R/W review permit and respond to questions regarding same . It is assumed that any fees associated with <br /> this permit will be waived and/or handled through interoffice coordination . <br /> Coordination with FEC regarding work in their R/W will be provided and permit application will be <br /> prepared and submitted . Coordination with FDOT regarding work in the US 1 right of way will also be <br /> provided and necessary information will be submitted to FDOT for this project . <br /> Task 4 —Construction Phase Services <br /> Consultant will provide construction phase services for this project , including bidding and contract <br /> administration , shop drawing review , coordination and meeting attendance , construction observation , <br /> coordination of record drawings , including electronic format in AutoCadd 2000 version in real world <br /> coordinates on CD , mylars , and final certification of completion of the project. It is anticipated that the <br /> duration of construction phase (notice to proceed to final completion) will be six (6) months and that on- <br /> site construction observations will be as appropriate with the level of construction activity . <br /> Consultant will answer contractor questions and prepare addendums , as needed which will be distributed <br /> to all the contract document holders . Consultant will attend a pre -bid meeting at the project site or main <br /> office . Consultant will sell project manuals from our office , including drawings , specifications , and <br /> generation of all addendums . <br /> HAGeneral\Miller\hidian River County\Proposals\Task A - 8th Street Forcemain.doc <br />