My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-174
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 1:17:15 PM
Creation date
9/30/2015 8:47:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2005
Control Number
2005-174
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates,Inc.
Subject
Work Order No.8 Master Planned Force Main
Design and Construction Services
Area
8th St. from I.R. Boulevard to 58th Ave.
Supplemental fields
SmeadsoftID
4952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Y <br /> Shop drawing submittals will be reviewed for conformance with the contract documents . Shop drawings <br /> will be submitted directly to Engineer. Consultant will review the submittals and return copies to the <br /> contractor and Indian River County Utilities . <br /> Consultant will provide coordination of project status meetings and observation of construction for the <br /> duration of the project. Consultant will also review pay requests and provide recommendations for <br /> payment to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector. Total observation time will be <br /> approximately 140 hours . The field inspector will observe construction in order to determine if the <br /> project is being constructed in accordance with the contract documents . This will include witnessing <br /> installation of piping, pressure testing of new piping . Work that Consultant believes does not comply <br /> with the contract documents will be brought to the attention of Indian River County Utilities and the <br /> contractor. <br /> Consultant will prepare record drawings of the forcemain using information provided by the contractor. <br /> A complete set of Mylar reproducible drawings , an electronic copy in AutoCAD format on a CD-ROM , <br /> and two sets of prints will be delivered to Indian River County Utilities upon completion of this project . <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the project. <br /> Consultant will provide two site visits with the contractor to review the status of the completion of these <br /> punch-list items . <br /> SCHEDULE : <br /> Tasks 1 is anticipated to be complete within 6 weeks of notice to proceed and Task 2 are anticipated to be <br /> completed within 4 months from notice to proceed . Task 3 is anticipated to be completed within 4 weeks . <br /> Construction phase services is anticipated to take approximately six ( 6) months after bidding . <br /> INFORMATION PROVIDED BY OWNER : <br /> The Owner shall provide the record drawings of water and sewer utilities along 8"' street from Kings <br /> Highway to Indian River Blvd . <br /> FEES : <br /> Consultant will provide these Services as described herein on a lump sum basis for the following fees : <br /> Task Fee <br /> 1 . Survey and Utility Locates $ 34, 100 <br /> 2 . Design $ 53 , 700 <br /> 3 . Permitting $ 13 , 200 <br /> 4 . Construction Phase Services $ 319400 <br /> Total $ 132 ,400 <br /> We will provide these services in accordance with our Continuing Services Contract Agreement for <br /> Professional Services dated April 6 , 2004 with Indian River County . <br /> HAGeneral\MillerUndian River CountyTroposals\Task A - 8th Street Forcemain.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.