My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-355
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:55:36 AM
Creation date
9/30/2015 10:13:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/10/2006
Control Number
2006-355
Agenda Item Number
11.J.1.
Entity Name
Masteller and Moler, Inc.
Subject
Work Order No. 8-force main for wastewater in CR510
Area
CR 510 east end Wabasso Bridge to A1A
Supplemental fields
SmeadsoftID
5897
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> 8/31 /2006 <br /> Page 2 <br /> Task B — Construction Plans <br /> Masteller & Moler, Inc . will utilize the route survey and base plans prepared by Masteller, Moler, Reed <br /> & Taylor, Inc. We shall use these base plans for design and preparation of construction plans for a 12" <br /> diameter force main. This project will begin at the east end of the Wabasso Bridge approach and <br /> proceed east to the existing pump station wet well at the southeast corner of CR 510 and Jungle Trail . A <br /> separate section of the 12" force main will connect to the pump station wet well and proceed east to SR <br /> A- 1 -A for connection to the existing force main system. The total estimated length of the proposed 12 " <br /> force main is t 4,600 feet. Our plans will show the necessary gate valves, air release valves, directional <br /> boring, and construction details. <br /> Task C - Permitting <br /> Masteller & Moler, Inc. services include permitting from the Florida Department of Environmental <br /> Protection (FDEP). In addition, an Indian River County Utility and Right-of-way permit and the ACOE <br /> Nationwide 14 Permit will be needed Masteller & Moler, Inc. will prepare the permit applications and <br /> supporting data and submit on behalf of the County. Permit application fees are not included in this <br /> Proposal . <br /> Task D - Construction Services <br /> Masteller & Moler, Inc. will provide assistance during bidding and periodic inspection of the pipeline <br /> system project on an as-needed basis to observe that construction is in reasonable compliance with the <br /> Contract Plans and Permits. We will also attend meetings, review shop drawings and monthly pay <br /> estimates from the contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.