Laserfiche WebLink
Attachment 1 <br /> 8/31 /2006 <br /> Page 2 <br /> Task B — Construction Plans <br /> Masteller & Moler, Inc . will utilize the route survey and base plans prepared by Masteller, Moler, Reed <br /> & Taylor, Inc. We shall use these base plans for design and preparation of construction plans for a 12" <br /> diameter force main. This project will begin at the east end of the Wabasso Bridge approach and <br /> proceed east to the existing pump station wet well at the southeast corner of CR 510 and Jungle Trail . A <br /> separate section of the 12" force main will connect to the pump station wet well and proceed east to SR <br /> A- 1 -A for connection to the existing force main system. The total estimated length of the proposed 12 " <br /> force main is t 4,600 feet. Our plans will show the necessary gate valves, air release valves, directional <br /> boring, and construction details. <br /> Task C - Permitting <br /> Masteller & Moler, Inc. services include permitting from the Florida Department of Environmental <br /> Protection (FDEP). In addition, an Indian River County Utility and Right-of-way permit and the ACOE <br /> Nationwide 14 Permit will be needed Masteller & Moler, Inc. will prepare the permit applications and <br /> supporting data and submit on behalf of the County. Permit application fees are not included in this <br /> Proposal . <br /> Task D - Construction Services <br /> Masteller & Moler, Inc. will provide assistance during bidding and periodic inspection of the pipeline <br /> system project on an as-needed basis to observe that construction is in reasonable compliance with the <br /> Contract Plans and Permits. We will also attend meetings, review shop drawings and monthly pay <br /> estimates from the contractor. <br />