Laserfiche WebLink
ATTACHMENT #2 <br /> LUMP SUM FEE TABULATION 6/312006 <br /> INDIAN RIVER COUNTY <br /> 12" FORCE MAIN PIPELINE ON CR 510 FROM EAST END OF WABASSO BRIDGE TO SR A-1 -A <br /> PROVIDE FOR ENGINEERING DESIGN / PREPARATION OF CONSTRUCTION PLANS AND <br /> PERMITTING APPLICATIONS / PERPARATION OF SPECIFICATIONS AND BID DOCUMENTS <br /> Professional Engineer Pro ed Engineer Designer CAD Administration <br /> $ 155.00 $ 125.00 $ 80.00 $ 45 .00 Total Comments <br /> Hours Amount Hours Amount Hours Amount Hours Amount Costs <br /> Engineering Design 6 $ 930.00 6 $ 750.00 15 $ 1 ,200.00 6 $ 270.00 $ 3, 150.00 <br /> Preparation of 18 $ 2,790.00 6 $ 750.00 75 $ 6,000.00 9 $ 405.00 $ 9,945.00 <br /> Construction Plans <br /> Preparation & Acquisition 12 $ 1 ,860.00 9 $ 11125.00 25 $ 2,000.00 25 $ 1 , 125.00 $ 6, 110.00 Permits needed from , <br /> IRC , <br /> of Permits FDEP and ACOE <br /> Prepare Specifications 10 $ 1 ,550.00 12 $ 1 ,500.00 6 $ 480.00 37 $ 1 ,665.00 $ 5 , 195.00 Includes final engineees <br />estimate <br /> and Bid Documents of construction cost. <br /> Total (hrs/cost) 46 $ 7,130.00 33 $ 4,125.00 121 $ 9,680.00 77 $ 3,465.00 $ 24,400.00 <br /> File 0649LA Engineering Design/Permitting $ 24,400.00 <br /> Sched_manhours.xls <br /> (Design_Services) Surveying Services $ 10,300.00 <br /> Total $ 34,700.00 <br />