Laserfiche WebLink
ATTACHMENT #2 <br /> LUMP SUM FEE TABULATION 8/312006 <br /> INDIAN RIVER COUNTY <br /> 12" FORCE MAIN PIPELINE ON CR 510 FROM EAST END OF WABASSO BRIDGE TO SR A-1 -A <br /> ASSISTANCE DURING BIDDING AND CONTRACT AWARD <br /> CONTRACT ADMINISTRATIOWPERIODIC CONSTRUCTION OBSERVATION <br /> Professional Engineer Protect Inspector Administration <br /> $ 155.00 $ 70.00 $ 45.00 Total Comments <br /> Hours Amount Hours Amount Hours Amount Costs <br /> Assistance during 6 $ 930.00 $ - 15 $ 675.00 $ 1 ,605.00 <br /> Bidding & Contract <br /> Award <br /> Contract Administration 10 $ 1 ,550.00 10 $ 700.00 10 $ 450.00 $ 2,700.00 Includes reviewof <br /> Shop Drawings <br /> Periodic Construction 5 $ 775.00 50 $ 3,500.00 $ - $ 4,275.00 <br /> Observation <br /> Total (hrs/cost) 21 $ 3,255.00 60 $ 4,200.00 25 $ 10125.00 $ 8,580.00 <br /> File 0649LA <br /> Sched_manhours.zls <br /> (Construction—Services) <br />