My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-256
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 2:03:30 PM
Creation date
9/30/2015 11:01:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/24/2007
Control Number
2007-256
Agenda Item Number
14.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.9 services Borrow Area Permitting
Area
County Landfill
Supplemental fields
SmeadsoftID
6481
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />29 June 2007 <br />Page 3 <br />Department. Geosyntec will prepare presentation graphics, engineering drawings, and other <br />documents required to support the meetings and project coordination activities. <br />A kickoff meeting with SWDD is proposed before the start of project activities so that the <br />specific project requirements can be discussed. If required by SWDD, Geosyntec will prepare for <br />and attend a meeting with the SWDD Board to explain the project scope and budget <br />requirements. Geosyntec will also schedule and attend, with SWDD staff, three separate pre - <br />application meetings with SJRWMD, IRFWCD and IRC Planning Department to discuss specific <br />permitting issues. Following each meeting, Geosyntec will prepare meeting minutes that <br />document decisions reached in the meetings. <br />Project management activities will <br />include: budget <br />and schedule tracking, invoice <br />review, and <br />project communications, including <br />the preparation <br />of a monthly progress report. <br />The project <br />report will include a description <br />of the activities <br />completed during the month and planned <br />activities for the following month. <br />In addition, the <br />progress report will identify any <br />technical or <br />administrative issues that require SWDD's attention and the current status of the <br />budget and <br />schedule. <br />For the purpose of this budget estimate, Geosyntec has included six meetings: (i) one kickoff <br />meeting with SWDD; (ii) two (pre -application and review) meetings with SJRWMD and SWDD <br />staff; (iii) one pre -application meeting with IRFWCD and SWDD staff; and two (pre-app)ication <br />and review) meetings with IRC Planning Department and SWDD staff. <br />Task 2: Environmental Resource Permit (ERP) Application <br />A Standard General Environmental Resource Permit is required from the St. Johns River Water <br />Management District (SJRWMD). Specific project conditions correspond with the general <br />restrictions noted within the permit guidelines and include; impoundment volume at the final <br />development stage is less than 120 acre-feet, alteration of less than one acre of wetlands, the <br />project size is less than 100 acres. Preparation of the ERP application will require the <br />completion of Sections A, C, and E of the SJRWMD application form (40C-4.900(1). <br />As noted in the SJRWMD regulatory guidelines, the ERP program/application process is <br />required to ensure water resource protection from impacts to surface waters, floodplains, and <br />wetlands. The ERP application will require significant efforts to specifically address the <br />concerns of the SJRWMD and will include the following information; <br />• Site information; <br />xL07 1 Ton L7o 14e.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.