Laserfiche WebLink
Mr. Himanshu Mehta, P.E. <br />29 June 2007 <br />Page 3 <br />Department. Geosyntec will prepare presentation graphics, engineering drawings, and other <br />documents required to support the meetings and project coordination activities. <br />A kickoff meeting with SWDD is proposed before the start of project activities so that the <br />specific project requirements can be discussed. If required by SWDD, Geosyntec will prepare for <br />and attend a meeting with the SWDD Board to explain the project scope and budget <br />requirements. Geosyntec will also schedule and attend, with SWDD staff, three separate pre - <br />application meetings with SJRWMD, IRFWCD and IRC Planning Department to discuss specific <br />permitting issues. Following each meeting, Geosyntec will prepare meeting minutes that <br />document decisions reached in the meetings. <br />Project management activities will <br />include: budget <br />and schedule tracking, invoice <br />review, and <br />project communications, including <br />the preparation <br />of a monthly progress report. <br />The project <br />report will include a description <br />of the activities <br />completed during the month and planned <br />activities for the following month. <br />In addition, the <br />progress report will identify any <br />technical or <br />administrative issues that require SWDD's attention and the current status of the <br />budget and <br />schedule. <br />For the purpose of this budget estimate, Geosyntec has included six meetings: (i) one kickoff <br />meeting with SWDD; (ii) two (pre -application and review) meetings with SJRWMD and SWDD <br />staff; (iii) one pre -application meeting with IRFWCD and SWDD staff; and two (pre-app)ication <br />and review) meetings with IRC Planning Department and SWDD staff. <br />Task 2: Environmental Resource Permit (ERP) Application <br />A Standard General Environmental Resource Permit is required from the St. Johns River Water <br />Management District (SJRWMD). Specific project conditions correspond with the general <br />restrictions noted within the permit guidelines and include; impoundment volume at the final <br />development stage is less than 120 acre-feet, alteration of less than one acre of wetlands, the <br />project size is less than 100 acres. Preparation of the ERP application will require the <br />completion of Sections A, C, and E of the SJRWMD application form (40C-4.900(1). <br />As noted in the SJRWMD regulatory guidelines, the ERP program/application process is <br />required to ensure water resource protection from impacts to surface waters, floodplains, and <br />wetlands. The ERP application will require significant efforts to specifically address the <br />concerns of the SJRWMD and will include the following information; <br />• Site information; <br />xL07 1 Ton L7o 14e.doo <br />