Laserfiche WebLink
Mr. Himanshu Mehta, P.E. <br />29 June 2007 <br />Page 4 <br />• Environmental considerations; <br />• Conceptual construction plans; <br />• Specific construction schedules and techniques; <br />• Drainage information; <br />• Operation and maintenance; and <br />• Water use. <br />Appropriate sections of the ERP will be completed including the results of specific calculations <br />packages are required. <br />Task 3: Consumptive Use Permit (CUP) Modification <br />It is very likely that a minor modification to the existing Consumptive Use Permit (CUP) will be <br />required. As noted in the existing CUP (SJRWMD ID - 2185), the overall footprint of the <br />proposed borrow area will likely change since the previous submittal indicated a combined total <br />36.05 acres. Current conceptual plans yield approximately the same footprint however, the edge <br />of the proposed pit has been altered to eliminate potential impacts to existing surface water <br />drainage patterns and two isolated wetland systems within the central portion of the subject <br />property. Geosyntec will ascertain the need fro a CUP minor modification at the pre -application <br />meeting with SJRWMD. <br />Task 4: Stormwater Management and Tree Removal Permit Application <br />A stormwater management and tree removal permit for the borrow area will be needed from the <br />IRC Planning Department. Geosyntec will schedule a pre -application review meeting with the <br />IRC Planning Department, prepare and submit the necessary permit application forms and <br />documents, and attend a final review meeting. <br />Task 5: Miscellaneous Permit Applications for the Borrow Area <br />The borrow pit operation will also require an emergency outfall for release of stormwater runoff <br />during events of intense rain. The outfall will most likely discharge to either the C-5 or the C-4 <br />canals, or both, of the iRFWCD. Geosyntec will meet with representatives of the IRFWCD to <br />agree on the location, configuration and design criteria of the outfall. We will also prepare the <br />x L07I Ton L70146. dac <br />