My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-256
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 2:03:30 PM
Creation date
9/30/2015 11:01:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/24/2007
Control Number
2007-256
Agenda Item Number
14.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.9 services Borrow Area Permitting
Area
County Landfill
Supplemental fields
SmeadsoftID
6481
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />29 June 2007 <br />Page 5 <br />permit application for the outfall in accordance with 1RFWCD requirements and respond to <br />requests for additional information (RAI). <br />The emergency outfall will also require an NPDES permit, or an approved alternative, from <br />FDEP. The SWDD presently operates its outfall that discharges to the C-6 canal under the Multi - <br />Sector General Permit (MSGP). Geosyntec recommends modifying the existing permit to <br />provide coverage to the new outfall. We will modify the Stormwater Pollution Prevention Plan <br />(SWPPP) of the site to include the area and facilities of the borrow pit operation. We will also <br />assist SWDD to prepare the permit application. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment 2. <br />The budget estimate does not include permit fees that will be required at the time the ERP <br />application is submitted to SJRWMD. <br />Task 1 — <br />General Consulting/Meeting Support/Project Management <br />$ <br />18,519 <br />Task 2 — <br />ERP Application <br />$ <br />54 006 <br />Task 3 — <br />GCCS Design <br />$ <br />7,458 <br />Task 4— <br />Stormwater & Tree Removal Permit Application <br />$ <br />9,522 <br />Task 5 — <br />Miscellaneous Permit Application <br />$ <br />10044 <br />TOTAL <br />(estimated) <br />$ <br />99 649 <br />Geosyntec will not exceed the cost estimate without prior approval and written authorization <br />from SWDD. <br />SCHEDULE <br />Geosyntec has prepared a schedule for preparing the required permit applications, which is <br />included as Attachment 3. The schedule, as presented, assumes a start date of 23 July 2007, and <br />projects an ERP Application submittal to SJRWMD on 29 October 2007. The other permit <br />applications will be submitted concurrently with the ERP Application. Geosyntec has assumed <br />that the required permit will be obtained within two to three months of submission. Response to <br />SJRWMD comments will be performed during this two- to three-month period. Therefore, it is <br />anticipated that the ERP, CUP, tree removal and other permits permit for the borrow area will be <br />issued by 31 January 2008 if not sooner. <br />xL07170/JL70I46-dog <br />,...triI I I i. I I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.