My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-251
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 10:12:09 AM
Creation date
9/30/2015 11:00:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/24/2007
Control Number
2007-251
Agenda Item Number
11.J.3
Entity Name
Masteller and Moler,Inc.
Subject
Work Order No.9 Master Plan Water Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Supplemental fields
SmeadsoftID
6431
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0741 <br />July 16, 2007 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />ATTACHMENT 1 <br />• Protect Description <br />Work Order No. 9 provides for professional engineering services for the surveying, design, permitting, <br />bidding and services during construction of Phase Two arterial water main system to serve Vero Lake <br />Estates. <br />Upon completion of this Phase Two arterial potable water pipeline construction project, all of the Vero <br />Lake Estates community can be provided with potable water by the future construction of water lines, <br />valves, hydrants and fittings no larger than 6" in diameter. <br />Work Order No. 9 is being implemented at this time to provide professional engineering services by <br />Masteller & Moler, Inc. associated with the project described above. The work to be performed as part <br />of this Work Order will generally include providing a route survey and base plans; preparation of project <br />design for the proposed 8" and 12" pipelines, preparation of contract plans; preparation of specifications <br />and bid documents; preparation and submittal of permit applications, assistance during bidding and <br />contract administration/periodic inspection for the pipeline project. <br />The estimated project construction cost is $1,130,000.00 <br />A brief description of the scope of services for Work Order No. 9 is provided below: <br />• Scope of Services <br />Task A — Route Survey and Base Plans <br />Masteller, Moler, Reed & Taylor, Inc will perform a Route Survey for proposed 12" waterlines located <br />in Vero Lake Estates described as follows: <br />1. Connection point of existing 12" water main on 87th Street at 98th Avenue west to proposed <br />waterline connection point per Schulke, Bittle & Stoddard plan at 104th Avenue. Length 3,910 <br />feet. <br />2. Intersection of 87th Street and 99th Court south on 99th Court to proposed waterline connection <br />point per Schulke, Bittle & Stoddard plan at 79th Street. Length 5,300 feet. <br />3. Intersection of 87th Street and 95th Avenue at existing 12" water main, south on 95th Avenue to <br />proposed waterline connection point per Schulke, Bittle & Stoddard plan at 79th Street. Length <br />5,300 feet. <br />See Exhibit "A" for location of pipelines and Exhibit "B" for cost estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.