Laserfiche WebLink
Our File #0741 <br /> July 16, 2007 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT 1 <br /> • Proiect Description <br /> Work Order No. 9 provides for professional engineering services for the surveying, design, permitting, <br /> bidding and services during construction of Phase Two arterial water main system to serve Vero Lake <br /> Estates. <br /> Upon completion of this Phase Two arterial potable water pipeline construction project, all of the Vero <br /> Lake Estates community can be provided with potable water by the future construction of water lines, <br /> valves, hydrants and fittings no larger than 6" in diameter. <br /> Work Order No. 9 is being implemented at this time to provide professional engineering services by <br /> Masteller & Moler, Inc. associated with the project described above. The work to be performed as part <br /> of this Work Order will generally include providing a route survey and base plans; preparation of project <br /> design for the proposed 8" and 12" pipelines, preparation of contract plans; preparation of specifications <br /> and bid documents; preparation and submittal of permit applications, assistance during bidding and <br /> contract administration/periodic inspection for the pipeline project. <br /> The estimated project construction cost is $ 1 , 130,000.00 <br /> A brief description of the scope of services for Work Order No. 9 is provided below: <br /> • Scope of Services <br /> Task A — Route Survey and Base Plans <br /> Masteller, Moler, Reed & Taylor, Inc. will perform a Route Survey for proposed 12" waterlines located <br /> in Vero Lake Estates described as follows: <br /> 1 . Connection point of existing 12" water main on 87th Street at 98th Avenue west to proposed <br /> waterline connection point per Schulke, Bittle & Stoddard plan at 104th Avenue. Length 3 ,910 <br /> feet. <br /> 2 . Intersection of 87th Street and 99th Court south on 991h Court to proposed waterline connection <br /> point per Schulke, Bittle & Stoddard plan at 79t' Street. Length 5,300 feet. <br /> 3 . Intersection of 87th Street and 95th Avenue at existing 12" water main, south on 95th Avenue to <br /> proposed waterline connection point per Schulke, Bittle & Stoddard pian at 79th Street. Length <br /> 5 ,300 feet. <br /> See Exhibit "A" for location of pipelines and Exhibit "B" for cost estimate. <br />