Our File #0741 <br />July 16, 2007 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />ATTACHMENT 1 <br />• Protect Description <br />Work Order No. 9 provides for professional engineering services for the surveying, design, permitting, <br />bidding and services during construction of Phase Two arterial water main system to serve Vero Lake <br />Estates. <br />Upon completion of this Phase Two arterial potable water pipeline construction project, all of the Vero <br />Lake Estates community can be provided with potable water by the future construction of water lines, <br />valves, hydrants and fittings no larger than 6" in diameter. <br />Work Order No. 9 is being implemented at this time to provide professional engineering services by <br />Masteller & Moler, Inc. associated with the project described above. The work to be performed as part <br />of this Work Order will generally include providing a route survey and base plans; preparation of project <br />design for the proposed 8" and 12" pipelines, preparation of contract plans; preparation of specifications <br />and bid documents; preparation and submittal of permit applications, assistance during bidding and <br />contract administration/periodic inspection for the pipeline project. <br />The estimated project construction cost is $1,130,000.00 <br />A brief description of the scope of services for Work Order No. 9 is provided below: <br />• Scope of Services <br />Task A — Route Survey and Base Plans <br />Masteller, Moler, Reed & Taylor, Inc will perform a Route Survey for proposed 12" waterlines located <br />in Vero Lake Estates described as follows: <br />1. Connection point of existing 12" water main on 87th Street at 98th Avenue west to proposed <br />waterline connection point per Schulke, Bittle & Stoddard plan at 104th Avenue. Length 3,910 <br />feet. <br />2. Intersection of 87th Street and 99th Court south on 99th Court to proposed waterline connection <br />point per Schulke, Bittle & Stoddard plan at 79th Street. Length 5,300 feet. <br />3. Intersection of 87th Street and 95th Avenue at existing 12" water main, south on 95th Avenue to <br />proposed waterline connection point per Schulke, Bittle & Stoddard plan at 79th Street. Length <br />5,300 feet. <br />See Exhibit "A" for location of pipelines and Exhibit "B" for cost estimate. <br />