Laserfiche WebLink
• <br />• <br />Attachment 1 <br />7/16/07 <br />Page 2 <br />Route Survey includes: <br />1. Establish survey baseline as directed by the Engineer, <br />2. Locate all monumentation for establishment of existing rights-of-way; <br />3. Locate and identify all visible topographic features along the route (ie: power poles, mailboxes, <br />pavement, culverts, etc.); <br />4. Obtain elevations along the route sufficient for engineering design purposes; <br />5. Elevations will be based on NGVD 1929 unless otherwise directed; <br />6. Prepare and provide five (5) paper copies and one (1) digital file of route survey upon completion of <br />field work. <br />Task B — Construction Plans <br />Masteller & Moler, Inc will utilize the route survey and base plans prepared by Masteller, Moler, Reed <br />& Taylor, Inc. We shall use these base plans for design and preparation of construction plans for 12" <br />diameter water mains as follows: <br />1. Connection point of existing 12" water main on 87th Street at 98th Avenue west to proposed <br />waterline connection point per Schulke, Bittle & Stoddard plan at 104th Avenue. Length 3,910 <br />feet of 12" diameter pipe. <br />2. Intersection of 87th Street and 99th Court south on 99th Court to proposed waterline connection <br />point per Schulke, Bittle & Stoddard plan at 79th Street. Length 5,300 feet of 8" diameter pipe. <br />3. Intersection of 87th Street and 95th Avenue at existing 12" water main, south on 95th Avenue to <br />proposed waterline connection point per Schulke, Bittle & Stoddard plan at 79111 Street. Length <br />5,300 feet of 8" diameter pipe. <br />The total estimated length of the proposed 12" water main is ± 3,910 feet and 8" water mains is ± 10,600 <br />feet. Our plans will show the necessary valves, hydrants, air release valves, directional boring, and <br />construction details. <br />Task C - Permitting <br />Masteller & Moler, Inc. services include permitting from the Florida Department of Environmental <br />Protection (FDEP) In addition, an Indian River County Utility and Right-of-way permit and an ACOE <br />Nationwide 14 Permit will be needed. Masteller & Moler, Inc will prepare the permit applications and <br />supporting data and submit on behalf of the County. Permit application fees are not included in this <br />Proposal. <br />Task D - Construction Services <br />Masteller & Moler, Inc. will provide assistance during bidding and penodic inspection of the pipeline <br />system project on an as -needed basis to observe that construction is in reasonable compliance with the <br />Contract Plans and Permits. We will also attend meetings, review shop drawings and monthly pay <br />estimates from the contractor. <br />