My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-199
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 12:36:34 PM
Creation date
9/30/2015 8:50:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2005
Control Number
2005-199
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Elimination of Scale Inhibitor Work Order No.9
Area
South RO Plant
Supplemental fields
SmeadsoftID
4980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ' <br /> ATTACHMENT 1 <br /> Scale Inhibitor System Review <br /> South RO Plant <br /> Project Description and Understanding <br /> The following provides an approach to consider eliminating scale inhibitor addition to the <br /> raw water at the South RO plant . The use of scale inhibitor at membrane treatment facilities <br /> is sometimes unwarranted where raw water quality does no exhibit sparingly soluble salts <br /> which tend to scale at high membrane system recoveries . Since acid is used both to prevent <br /> scaling of the membranes and enhance removal of hydrogen sulfide at the post-treatment <br /> system through lowering of the pH , it should be determined if acid provides adequate scale <br /> inhibition without the use of scale inhibitor. <br /> SCOPE <br /> Task 1 — investigate Elimination of Scale Inhibitor <br /> Define water quality from wells : <br /> Specific water quality parameters which cause scaling will be identified and a list prepared <br /> for a lab to test each well . Laboratory and coordination costs to be provided by Indian River <br /> County. <br /> Review raw water data <br /> These results will be tabulated and used to prepare membrane projections for worst case <br /> scaling potential . Blending of certain wells may also result in worst case water quality and <br /> will be evaluated . A matrix of water quality parameters will be prepared and reviewed . <br /> Run and review projections with membrane manufacturer <br /> We will run numerous projections and identify the worst case scaling potential without scale <br /> inhibitor. We will review these projection with Hydranautics and acquire consensus that <br /> specific operating conditions can be implemented without any long term scaling potential . <br /> Provide recommendations <br /> Based on the results and evaluation of projections , we will provide a recommendation which <br /> may justify elimination of scale inhibitor. <br /> Task 1 Alternate — Coordinate Bulk Tank Scale Inhibitor installation — (if neeessar <br /> If the use of scale inhibitor continues, the installation of 2 — 3000 gallon black HDPE tanks <br /> is required . We believe that the best option for installation of the two tanks is through the <br /> existing North outside wall . The existing tie-beam carries the roof loads , of which the <br /> existing windows and CMU block below it adjacent to the columns can be removed safely to <br /> allow for installation of the two new tanks . Installing the tanks from the south double doors <br /> does not appear to be a better alternative since this wall may be load bearing, carrying the <br /> capacity of the upper floor hollow core roof slabs . <br /> F. \Utilities\UTILITY - EMPLOYEE FOLDERS\Teny Southard\Agenda Item - Kimely Hom Scale Work Order 9 May 2005 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.