My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-203
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2016 3:56:15 PM
Creation date
9/30/2015 9:47:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/13/2006
Control Number
2006-203
Agenda Item Number
7.I.
Entity Name
Coastal Technology Corporation
Subject
Wabasso Beach Park restoration-Work Order CT-1
Supplemental fields
SmeadsoftID
5677
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 TO WORK ORDER CT- 1 — Professional Services <br /> WABASSO BEACH PARK RESTORATION <br /> 1 . INTRODUCTION <br /> In September 2004, Hurricanes Frances and Jeanne severely damaged Wabasso Beach Park <br /> ( Park); the storms destroyed the boardwalk , restroom , pavilions and portions of the parking area and <br /> roadway within the Park. This Scope of Work entails design and permitting services to provide for <br /> restoration of the Park (Project) . The Project entails restoration of the Park outside Florida <br /> Department of Transportation ( FDOT) right-of-way and makes use of existing stormwater <br /> management facilities without exceeding St. Johns River Water Management District (SJRWMD) <br /> thresholds for permit exemption ; this Scope of Work is based upon the expectation that no SJRWMD <br /> permits are required and that an FDOT utility permit will be required only for new water and sewer <br /> utilities located within SR At right-of-way. <br /> Services are proposed under the Continuing Contract Agreement for Professional Services between <br /> COUNTY and CONSULTANT, dated December 13 , 2005. CONSULTANT shall sub-contract water <br /> and sewer related services to Carter Associates , Inc. ( CAI ) . The following describes the work . <br /> 2. SCOPE <br /> A. Task 1 - Design : CONSULTANT has previously completed a draft preliminary site plan "pro <br /> bond". CONSULTANT shall provide customary preliminary and final design services for the site plan , <br /> and design of the boardwalk, boardwalk showers , sidewalks, paving , grading , water connection , <br /> sewer ( including lift station and force main ) and drainage . Scope of design for water and sewer is <br /> based upon service to the park restroom facility with (a ) all proposed water and sewer located on <br /> park property except for sewer force main connection to existing service line west of SR A1A, ( b ) <br /> the sewer lift station to be located landward of the VE flood zone and CCCL , and ( c) the bottom of <br /> the lift station to be set so as to allow for potential gravity flow connections by others to adjacent <br /> properties . For each phase of the design , CONSULTANT shall furnish three (3 ) copies of the <br /> Design Documents to COUNTY and CONSULTANT will meet with the COUNTY to review the <br /> Design Documents and the opinion of probable construction costs . The design will be prepared <br /> consistent with COUNTY standards for roadways , the Florida Building Code , and the U . S . Army <br /> Corps of Engineers Coastal Engineering Manual. The COUNTY shall provide standard details and <br /> Technical Specifications for pavement, curbs , sidewalks , and boardwalks . The design shall be <br /> based upon the survey by Morgan & Eklund Inc. ( M& E) dated April 25 , 2005 and titled " Boundary <br /> and Topographic Survey of Wabasso Beach Park For Indian River County" or as may be updated <br /> by the COUNTY or M&E . <br /> Another COUNTY consultant shall provide for design of the restroom , pavilions , landscaping , site <br /> lighting , and electricity. CONSULTANT shall incorporate standard building , structure , or other <br /> component design documents prepared by COUNTY or other COUNTY consultants into the <br /> Design Documents . CONSULTANT's responsibility with respect to such components shall be <br /> horizontal and vertical placement and orientation on the Site and integration with components <br /> designed by CONSULTANT. CONSULTANT shall coordinate the incorporation of such <br /> components with COUNTY and the COUNTY's Architect. In addition , COUNTY shall provide up to <br /> three ( 3) 30-foot soil borings and up to three ( 3) 15-foot soil borings , and one ( 1 ) geotechnical <br /> laboratory report from a Geotechnical firm currently under continuing contract with the COUNTY. <br /> The preliminary design drawings are to be the basis of formal permit applications by the COUNTY <br /> under Task 2 and the CONSULTANT under Task 3. CONSULTANT shall prepare a written <br /> description of the Project design criteria and any material changes from the draft Preliminary Site <br />
The URL can be used to link to this page
Your browser does not support the video tag.