My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-186
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 2:45:09 PM
Creation date
9/30/2015 9:44:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/06/2006
Control Number
2006-186
Agenda Item Number
7.M.
Entity Name
Donadio & Associates, Architects, P.A.
Subject
Wabasso Beach Park Restoration- Hurricanes Frances & Jeanne
Work Order No. DA-1
Area
Wabasso Beach Park
Supplemental fields
SmeadsoftID
5660
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br /> to <br /> Work Order Number DA- 1 <br /> Wabasso Beach Park Restoration Design <br /> 1 . COMPENSATION : <br /> The Architect will be compensated for Architectural/Engineering services performed <br /> under this Work Order Number 1 in accordance with a lump sum method. The total <br /> lump sum amount will be $50.750.00. <br /> Progress payments to be made monthly based on the completion percentage as stated <br /> below : <br /> Schematic Design Phase 15 % <br /> Design Development Phase 20% <br /> Construction Document Phase 40% <br /> Bidding and Bid Evaluation 5 % <br /> Construction Administration 20% <br /> TOTAL 100% <br /> Not included in the above compensation are ; Design of Boardwalks , Ramps and <br /> Benches, Site Surveying, Civil Engineering for paving, grading and utility <br /> distribution, Off-site Civil Engineering, Detailed Construction Cost Estimates, <br /> Geotechnical Reports, Environmental Surveys, Reimbursable Expenses & <br /> Application Fees for Agency approvals. <br /> 2. PARTIAL PAYMENTS : <br /> The COUNTY shall make progress payments to the CONSULTANT for all <br /> authorized work pertaining directly to this project as noted. The CONSULTANT <br /> shall submit invoices for these services performed pursuant to this Agreement at each <br /> of the above phases . <br /> The CONSULTANT shall submit duly certified invoices in duplicate to the Director <br /> of the Public Works Department. For lump sum line items , the amount submitted <br /> shall be the amount due for all work performed to date under that phase, of the work <br /> completed as certified by the CONSULTANT . <br /> The amount of the partial payment due the CONSULTANT for the work performed <br /> to date under these phases shall be an amount calculated in accordance with the <br /> previous paragraph, less ten percent ( 10%) of the invoice amount thus determined, <br /> which shall be withheld by the COUNTY as retainage, and less previous payments. <br /> Per F . S . 218 . 74(2), the COUNTY will pay approved invoices on or before the forty- <br /> fifth day after the COUNTY receives the CONSULTANT ' S invoice. <br /> Per F . S. 218 . 74(2) , the ten percent ( 10%) retainage withheld shall be paid in full to <br /> the CONSULTANT by the COUNTY, on or before the forty-fifth day after the date <br /> of final acceptance of the Work by the Public Works Director. <br /> END ATTACHMENT 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.