Laserfiche WebLink
Attachment 3 <br /> to <br /> Work Order Number DA-1 <br /> Wabasso Beach Park Restoration Design <br /> 1 . TIME FRAME : <br /> The proposed Time Frame is based upon the above stated scope of work and will be <br /> completed as follows, unless the scope of work is modified and/or changed as <br /> directed by the Owner in writing : <br /> Schematic Design Phase 4 Weeks <br /> Design Development Phase 6 Weeks <br /> Construction Document Phase 8 Weeks <br /> TOTAL 18 Weeks <br /> END ATTACHMENT 3 <br />