My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Gifford QAPP <br /> Section A <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page of 18 <br /> The pre-construction samples will be grab samples in the approximate location of <br /> the post-construction sampling study area . Post-construction samp es will be <br /> composite samples taken by automatic samplers equipped with per staltic pumps <br /> and flow meters . Each automatic sampler will take flow-weighted composite <br /> samples ( i . e . the amount of sample collected is proportional to the flow rate ) . <br /> Refer to Figure A . 2 for the pre-construction field sampling location and for the <br /> post-construction automatic sampler and field sampling locations . <br /> All laboratory analysis will be performed in accordance with U . S . EPA and FDEP <br /> approved protocols . All analytical activities and data quality objectives will <br /> correspond to Chapter 62 -302 , April 9 , 2002 version of the SOPs . <br /> A6 . 3 Projected Schedule and Scope of Work <br /> 1 . Estimated Project Beginning Date : September 2002 <br /> 2 , Estimated Project Ending Date : June 2005 <br /> Major Proiect Tasks <br /> Specific Project Activity Scheduled Date ( 1 ) <br /> 1 . Secure Testing Laboratory March 2005 <br /> 2 . Coordinate with Testing Laboratory March 2005 <br /> 3 . Finalize automatic sampler program <br /> settings and sample location points April 2005 <br /> 4 . Pre-construction Grab sampling December 2003 <br /> 5 , Project Construction Start date June 2003 <br /> 6 . Post- Construction sampling/analysis April 2005 <br /> 7 . First bimonthly report July 2005 <br /> 8 . First semiannual review report October 2005 <br /> 9 . Final Report April 2006 <br /> ( 1 ) Projected dates . Actual dates may be different than those shown . <br /> [The remainder of this page was left blank intentionally] <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.