My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ATTACHMENT 2 to WORK ORDER NO. G- 1 <br /> OPERATION AND MAINTENANCE OF AUTOSAMPLER DATA <br /> COLLECTION SITES , AND COLLECTION AND DELIVERY OF <br /> STORMWATER SAMPLES FOR THE <br /> " EAST GIFFORD STORMWATER IMPROVEMENT PROJECT " <br /> 1 . COMPENSATION <br /> The COUNTY agrees to pay , and the CONSULTANT agrees to accept , a fee for <br /> services rendered according to Attachment 1 , as follows : <br /> ( a ) The CONSULTANT will be paid $ 800 per month ( based on tw sites ( influent <br /> and effluent) , one hour per site visit , and four visits to each Site per month ) . If <br /> the site visit exceeds one hour, reimbursement for the additional time will be <br /> as discussed in paragraph 1 . (d ) , below . This fee will cover weekly QA visits <br /> to each of the two stormwater autosamplers to ensure proper peration . All <br /> automatic sampler programming , hardware operation , and hOL sekeeping will <br /> be covered under these visits . Raw data (downloads via ' flop y or CD ' and <br /> original QA inspection forms ) will be turned over to the COUNTY during the <br /> contract period or at their request . <br /> ( b ) After each stormwater sampling event, (where the CONSULTANT performs <br /> field measurements , delivers the stormwater samples to the Central <br /> Wastewater Treatment Plant , and reconfigures the automatic samplers for <br /> the next event ) , the CONSULTANT will be paid $ 100 per site visit for the first <br /> hour and $ 50 per hour for each hour beyond the first hour. <br /> ( b ) The CONSULTANT will be paid $ 1 , 600 per autosampler site for installation , <br /> initial programming , calibration , hardware setup , and other relce ted tasks . <br /> There are two sampler sites — one at the influent to the storm ater pond and <br /> the other at the pond ' s effluent weir. This is a one-time fee . Si a setup <br /> includes creating a field folder, the contents of which are a site description , <br /> maps , sketches , custom QA inspection forms , photos , and inventory . This <br /> field folder will be setup in USGS and SJRWMD format . Also , the <br /> CONSULTANT will provide historical rainfall data for the area back to <br /> January 1 , 2002 if available . This compensation can be summarized : $ 1 , 600 <br /> x 2 sampler sites = $ 3 , 200 . <br /> (c ) Additional Service Compensation — All other compensation su h as <br /> troubleshooting (when site visit exceeds one hour of normal QA inspection <br /> time per site ) , special work (e . g . Pygmy/ Price AA/Floating Rod manual <br /> readings ) , and other unanticipated events (e . g . reconfiguring/rhoving site <br /> hardware , repairs , etc . ) shall be reimbursed at $ 50 per hour. <br /> 3 <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program Work Order No. 1 - M ke Wickwire . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.