My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-163
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 4:07:59 PM
Creation date
9/30/2015 9:42:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2006
Control Number
2006-163
Agenda Item Number
11.I.3.
Entity Name
Hardesty & Hanover LLP - FDOT
Subject
Work Order No. HH-1-Wabasso Causeway East & West Fishing Piers
Supplemental fields
SmeadsoftID
5632
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
View images
View plain text
Financial Project ID: 2506152-32-02 <br />11. The Consultant shall prepare permit application(s) as required for submittal to other <br />agencies by the Department including forms, sketches, plan sheets and hydraulic <br />calculations. <br />12. Make reviews, attend meeting and make contacts as are necessary for proper <br />preparation of plans and special provisions for these design services. <br />13. The Consultant shall serve as an expert witness in the legal proceedings related to <br />these design services if required by the Department. The fee for these services shall <br />be established if and when they are needed. <br />14. The Consultant shall prepare the Technical Special Provision, supplemental <br />Specifications, and the Special Provisions required for the construction of the <br />roadway, structures, and traffic operations portions of the project. <br />15. The Consultant shall notify the Department of any utility conflicts and coordinate <br />with the Department in all relocation efforts. <br />16. The Consultant shall establish a data base for review comments and shall tender an <br />analysis of these comments 30 days prior to the end of the contract or 24 months from <br />the beginning, whichever comes first. <br />B. DESIGN SUPPORT — Plan Review <br />Review and comment on the preparation by in-house design section or Consultant design <br />team, of construction plans at Phase I, Phase 11, Phase Ell and Final submittal; of <br />construction technical specifications at Phase III plans review stage and at Final <br />submittal. Based upon such reviews, recommend acceptance and approval by the <br />Department of such plans, Specifications and estimates. Certify to the Department by <br />letter that the plans, specifications and cost estimate have been reviewed and that the <br />design IS or IS NOT in general accordance with both the applicable and current standards <br />of AASHTO, the FDOT, and with the intended scope of work. <br />In reviewing documents, certain basic tasks must be carried out as follows: <br />• Identify and report on design components which require Design Variance or Design <br />Exception. <br />• Make sure that the description of work to be constructed is clear and concise. <br />• Review Pay Items to make sure that all work has a Pay Item. <br />• Make sure that the summary of quantities are accurate and are in accordance with the <br />Basis of Estimates Manual. <br />• Review design documents and inspect the job site as required to make sure that field <br />conditions have been investigated and clearly represented in the contract documents. <br />• Review such items as Utilities, Maintenance of Traffic, Construction Sequences and <br />Phasing, Permit Requirements and Conditions, Quantities, and Equipment <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).